VT Secures Major Share

Thursday, July 20, 2000
Vosper Thornycroft (VT) is scheduled to play a significant role in the design and construction of the initial batch of Type 45 destroyers for the Royal Navy.

VT will share in the design and production of the first three ships as well as the assembly of the second ship, which will be named HMS Dauntless. The company is currently working with the prime contractor BAE Systems on the design of the new class. Production work will commence in early 2002, with the second ship, to be assembled by VT, delivered to the Royal Navy in 2009.

Maritime Reporter July 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

Rock On: UK's Kent Beach Flood Defence Starts

Rocks are being delivered as work by Van Oord starts on the £30m scheme to protect 1,400 properties at Broomhill Sands Coastal Defence Scheme in Kent, informs UK's Environment Agency.

Port of Long Beach Chooses APS Crane OCR System

APS Technology Group, a member of the ABB Group and a leading provider of optical character recognition (OCR) and process automation technology solutions for marine and intermodal container terminals,

CMB Cancels Order with S.Korean Shipbuilder

Belgian dry bulk shipping group CMB said on Tuesday it had cancelled an order for four vessels with South Korean shipbuilder Samjin set to be delivered in 2014.

 
 
Maritime Contracts Maritime Security Naval Architecture Navigation Offshore Oil Pod Propulsion Port Authority Salvage Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1002 sec (10 req/sec)