VT Secures Major Share

Thursday, July 20, 2000
Vosper Thornycroft (VT) is scheduled to play a significant role in the design and construction of the initial batch of Type 45 destroyers for the Royal Navy.

VT will share in the design and production of the first three ships as well as the assembly of the second ship, which will be named HMS Dauntless. The company is currently working with the prime contractor BAE Systems on the design of the new class. Production work will commence in early 2002, with the second ship, to be assembled by VT, delivered to the Royal Navy in 2009.

Maritime Reporter November 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

QGEP to Acquire FPSO from Teekay

Teekay Offshore Partners L.P. has entered into an agreement with a consortium led by Queiroz Galvão Exploração e Produção SA (QGEP) to provide a floating production,

Wärtsilä Bags Seawater Desalination System Orders

The Meyer Werft Germany, Meyer Turku, STX France and Fincantieri shipyards have all placed orders with Wärtsilä for the supply of fresh water generators to a total of seven cruise ships.

Jackup Rig Delivered to Abu Dhabi’s NDC

Lamprell delivers its 11th Super 116E jackup drilling unit Lamprell has completed the construction of jackup drilling rig, the Shuwehat, and has delivered the

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Naval Architecture Navigation Pod Propulsion Salvage Ship Repair Ship Simulators Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1238 sec (8 req/sec)