VT Secures Major Share

Thursday, July 20, 2000
Vosper Thornycroft (VT) is scheduled to play a significant role in the design and construction of the initial batch of Type 45 destroyers for the Royal Navy.

VT will share in the design and production of the first three ships as well as the assembly of the second ship, which will be named HMS Dauntless. The company is currently working with the prime contractor BAE Systems on the design of the new class. Production work will commence in early 2002, with the second ship, to be assembled by VT, delivered to the Royal Navy in 2009.

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter February 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

Sea IT, Veritas Tankers Ink Long-term Software Deal

Sea IT has entered a long term ICT agreement with Veritas Tankers. The agreement comprises installation of BlueCORE Generation 4, an ICT platform specifically developed for the marine industry,

Interior Facelift for Queen Mary 2

Cunard’s luxurious flagship, the iconic 2,620 passenger ocean liner Queen Mary 2, will undergo an interior refit at the hands of McCue Marine during a 25-day multimillion-pound

Chemical Shipping Freight Rates to Remain Under Pressure

On the back of low bunker prices and more new buildings to be delivered in 2016, chemical shipping freight rates for both contracts of affreightment and spot cargoes

 
 
Maritime Contracts Maritime Security Maritime Standards Navigation Offshore Oil Pipelines Port Authority Salvage Ship Simulators Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0661 sec (15 req/sec)