Navy Awards Northrop Grumman Perfect Scores on Restoration of USS Cole

Monday, May 13, 2002
Northrop Grumman Corporation announced today that the U.S. Navy has awarded Northrop Grumman Ship Systems perfect scores for the work accomplished during the final phase of restoration of the Aegis guided missile destroyer USS Cole (DDG 67). Northrop Grumman Ship Systems received the highest marks possible in the specified performance areas of Schedule, Technical, Management and Cost for the performance period from January through April 2002; and, based on the perfect scores, the Navy awarded Northrop Grumman $3.9 million in performance award fee funding. The USS Cole, which was redelivered ahead of schedule, sailed from Northrop Grumman Ship Systems' Ingalls facility in Pascagoula, Miss., April 19, 2002, and returned to her homeport in Norfolk, Va., April 24, 2002. "The Navy's performance award is a tribute to the employees of Northrop Grumman Ship Systems and their ability to fulfill each task efficiently and on schedule," said Dr. Philip A. Dur, Northrop Grumman corporate vice president and president of the company's Ship Systems sector. "The USS Cole is a national symbol of the indomitable spirit of the United States Navy. She was repaired with emotion, energy and a deeply felt sense of patriotism by our shipbuilders in Pascagoula." Following a terrorist attack in Aden, Yemen, in October 2000, the ship underwent an extensive 14-month restoration project. Exactly 18 months later, the ship went to sea April 12 for her first underway period since the attack, fully testing all systems, including propulsion plant, main machinery and auxiliary machinery that required extensive repair or replacement during the restoration period.
Maritime Reporter August 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

ClassNK Head Attends KOTC Delivery Ceremony

Noboru Ueda, Chairman and President of ClassNK attended the delivery ceremony for the M/T Al Yarmouk, constructed at Daewoo Shipbuilding & Marine Engineering Co.

Vard Orders Parat Electric Steam & Hot Water Boilers

During the last month, PARAT Halvorsen AS has collected four new boiler plant orders from the Vard Group and their multipurpose platform ships of Vard 1 08 design.

N-KOM Lays Keel for Qatar’s First Liftboat

Nakilat-Keppel Offshore & Marine (N-KOM) has achieved another milestone with the keel laying of its first liftboat newbuild project, awarded in July 2014 by long-time

Navy

Today in U.S. Naval History: September 2

Today in U.S. Naval History - September 2 1918 - Navy ships and crews assist earthquake victims of Yokohama and Tokyo, Japan 1940 - Destroyer-for-Bases agreement between U.

STS Young Endeavour Prepares for World Voyage

The Royal Australian Navy operated Sail Training Ship, Young Endeavour, is undergoing maintenance work in preparation for a 12-month world circumnavigation. It

Newport News Selects Paramarine Design Software

QinetiQ’s Paramarine Ship and Submersible Design Software has been selected by Newport News Shipbuilding (NSS) as its primary naval architectural software. QinetiQ

 
 
Maritime Contracts Maritime Security Maritime Standards Naval Architecture Offshore Oil Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1072 sec (9 req/sec)