Navy Awards Northrop Grumman Perfect Scores on Restoration of USS Cole

Monday, May 13, 2002
Northrop Grumman Corporation announced today that the U.S. Navy has awarded Northrop Grumman Ship Systems perfect scores for the work accomplished during the final phase of restoration of the Aegis guided missile destroyer USS Cole (DDG 67). Northrop Grumman Ship Systems received the highest marks possible in the specified performance areas of Schedule, Technical, Management and Cost for the performance period from January through April 2002; and, based on the perfect scores, the Navy awarded Northrop Grumman $3.9 million in performance award fee funding. The USS Cole, which was redelivered ahead of schedule, sailed from Northrop Grumman Ship Systems' Ingalls facility in Pascagoula, Miss., April 19, 2002, and returned to her homeport in Norfolk, Va., April 24, 2002. "The Navy's performance award is a tribute to the employees of Northrop Grumman Ship Systems and their ability to fulfill each task efficiently and on schedule," said Dr. Philip A. Dur, Northrop Grumman corporate vice president and president of the company's Ship Systems sector. "The USS Cole is a national symbol of the indomitable spirit of the United States Navy. She was repaired with emotion, energy and a deeply felt sense of patriotism by our shipbuilders in Pascagoula." Following a terrorist attack in Aden, Yemen, in October 2000, the ship underwent an extensive 14-month restoration project. Exactly 18 months later, the ship went to sea April 12 for her first underway period since the attack, fully testing all systems, including propulsion plant, main machinery and auxiliary machinery that required extensive repair or replacement during the restoration period.
Maritime Reporter July 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

Royal IHC Starts Building EasydredgeTM 2700

Royal IHC (IHC) is constructing the first vessel in its range of competitively priced standard trailing suction hopper dredgers (TSHD). It has started to build

MN 100: Horizon Shipbuilding, Inc.

13980 Shell Belt Road Bayou La Batre, AL 36509 E-mail: trshort@horizonshipbuilding.com Website: www.horizonshipbuilding.com President and General Manager: Travis R.

MN 100: Kvichak Marine Industries, Inc.

469 NW Bowdoin Place Seattle, WA 98107 Telephone: 206 545 8485 E-mail: sales@kvichak.com Website: www.kvichak.com CEO/President: Keith Whittemore Number of

Navy

General Dynamics Delivers North Dakota (SSN-784) to U.S. Navy

General Dynamics Electric Boat yestereday delivered the nuclear-powered attack submarine North Dakota (SSN-784) on time and more than $30 million below target cost.

East and South China Sea Disputes Need Creative Diplomacy

China and the United States appear headed for a damaging confrontation over the extent of China's territorial claims in the South and East China Seas. Now that

Darwin, Australia Scene of KAKADU Exercise Planning

Over 1,200 military personnel from the Asia Pacific and Indian Ocean regions have completed collaborative, tactical warfare planning during the first week of the

 
 
Maritime Careers / Shipboard Positions Maritime Security Maritime Standards Naval Architecture Offshore Oil Pod Propulsion Port Authority Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1179 sec (8 req/sec)