P&OSL Dover Returns to A&P Falmouth

Monday, April 22, 2002
The P&O Stena Line passenger/car ferry P&OSL Dover has dry docked in A&P Falmouth after arriving on 15th April 2002. This will be the final vessel from the P&O Stena Line fleet to undergo refit this season. The P&OSL Dover has dry docked in Falmouth every year since 1990 (when she first came in as Pride of Dover). The vessel will undergo various repairs whilst in dock similar to the repairs which were recently undertaken on her sister ship the P&OSL Calais, including tail shaft and tank surveys, stern seal maintenance, bow thrust unit repairs, hull and deck preparation and painting, main engine overhaul and survey, maintenance to bow and stern doors, lifeboats and firefighting equipment, overhaul and cleaning of galley equipment and the entire renewal of the International Food Court dining area. Also a new system for recovery of oil from bilge water additional to current legislation requirements will be installed. The P&OSL Dover will be the seventh vessel from P&O Stena Line to visit Falmouth this winter season and A&P Falmouth is pleased to say that the ferry refit season has progressed very well despite tight docking schedules.
Maritime Reporter July 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Legal

Oceanteam Acquires Oceanwind

Oceanteam Shipping has acquired the remaining 48% stake in fellow Dutch firm Oceanwind and is now the sole owner of Oceanwind Cable Storage & Handling Solutions.

US Senate Energy Panel Votes to Lift Oil Export Ban

The U.S. Senate Energy Committee on Thursday passed a bill that would lift a decades-old ban on the export of crude oil.   The 22-member panel passed the bill

Legislation Introduced to Lift Cuba Embargo

A new piece of legislation, the Cuba Trade Act of 2015, was introduced in Congress Tuesday that aims to lift the Cuba embargo and allow for U.S. businesses in the

Ship Repair & Conversion

UK Navy Chooses Effer Crane Again

Cranes manufacturer Effer informs its marine crane has recently been installed aboard the U.K. Royal Navy’s patrol vessel HMS Mersey.   The new 5s 275M crane,

Fire-stricken Icebreaker Overhauled

SENER concludes the Almirante Irizar icebreaker engineering works for re-outfit and overhaul   SENER reports it has completed the engineering works relating to

Engine Refit for Mersey Pilot Boat

James Troop supplies two new Volvo Penta engines to upgrade Mersey pilot boat   Merseyside-based engine specialist James Troop & Co has secured a deal to supply

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Naval Architecture Navigation Pod Propulsion Port Authority Ship Electronics Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1095 sec (9 req/sec)