Bollinger To Build 3 Boats for Chouest

Friday, April 05, 2002
Bollinger Shipyards signed a contract for three 145 ft. supply/utility boats with Edison Chouest Offshore. "It's wonderful to again be building boats for the Chouest organization," said Donald "Boysie" Bollinger, chairman and CEO of Bollinger. Gary Chouest, president of Edison Chouest, said, "We look forward to building boats with a yard which has quality people, and products." Vessels will meet new regulatory standards and will be less than 100 GT (U. S. Reg.) and less than 500 GT (ITC) registered tonnage. Each vessel will measure 145 x 36 ft. with a maximum draft of 11.5-ft. Normal operating draft will be eight ft. A pair of Cummins KTA-38MO diesel engines rated 750 bhp at 1,600 rpm were selected to power the vessel, driving Bollinger 72 x 57 in., four-blade, stainless steel propellers through Twin Disc MG5301 reverse/reduction gears with a ratio of 4.96:1. The second and third vessels will be powered by two Caterpillar 3508B-diesel engines rated at 855 bhp at 1,600 rpm, driving 72 in., four blade NiBrAl propellers through Twin Disc MG 5301 reverse reduction gears with a ratio of 4.96:1. International Marine Systems Hydraulic steering will be installed at two pilothouse stations and a 272 hp Schottel, STT-110 bow thruster will aid steering on all three vessels. The engines feature a package that meets new IMO emission standards. The boats' electrical power will be provided by two Cummins 6CTA8.36 diesels driving two Cummins 99 KW generators with direct drive liquid mud pumps off of the generator engines thereby eliminating belt systems. Each of the new Chouest OSV's will be equipped with four liquid mud tanks and two Methanol tanks. Their large 95 x 32 ft. aft decks will be able to carry up to 390 long tons of cargo. Their crew/passenger decks will emphasize crew comfort with larger staterooms and living quarters with extra sound proofing and carpeting and 20 tons of Carrier air conditioning and 25kW heating. Delivery of the first vessel will be summer 2002 with the remaining vessels following in October and December 2002. Contract terms were not disclosed.
Maritime Reporter September 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds


GTT Inks Framework Partnership Deal with CERN

GTT, a designer of membrane containment systems for the maritime transportation and storage of liquefied natural gas (LNG), has signed a Framework Partnership Agreement

SBM Offshore Says Petrobras Discussions Ongoing

Floating production services provider SBM Offshore responded to media reports of a potential settlement with Petrobras regarding tenders in Brazil, stating the

Two RAscal 1500 Tugs Delivered

Sanmar Shipyard of Turkey has recently completed two RAscal 1500 tugs for Jordanian owners. The tugs are now delivering marine services to the FSRU berthing


HMAS Melbourne Intercepts 427kg Heroin

HMAS Melbourne’s crew has seized 427 kilograms of heroin hidden in a fishing dhow carrying the illegal drugs across the Indian Ocean. The intercept occurred

Xerox, MHI Ink ITS Project Deal

Today, at the ITS World Congress and Exhibition, Xerox and Mitsubishi Heavy Industries (MHI), both leaders in transportation solutions, signed a Memorandum of Understanding to explore,

ICTSI Colombia Gears for 2016 Launch

Sociedad Puerto Industrial de Aguadulce S.A. (SPIA), a unit of International Container Terminal Services, Inc. (ICTSI) in Colombia, recently received four super

Maritime Contracts Maritime Security Maritime Standards Naval Architecture Offshore Oil Port Authority Salvage Ship Electronics Ship Simulators Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1441 sec (7 req/sec)