European Seaway & Pathway Visit A&P Tyne

Thursday, March 07, 2002
A&P Tyne has welcomed back two P&O vessels to its Wallsend yard. The 2 22,986 grt passenger/car RoRo vessels have provided work for over 200 men while at the yard. The European Seaway arrived on January 11 for a 15-day refit period which involved general repairs, ballast and fresh water tank cleaning and painting. All work was completed with the vessel departing on time on January 26, 2002. When the European Seaway returned to service the European Pathway left Dover and arrived at Tyne on January 30 for a 15 day annual refit. Work was again successfully completed with the vessel departing on schedule on February 13.
Maritime Reporter July 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Marine Electronics

Harris Secures Certification for its Multi-channel Manpack Radio

Harris Corporation (NYSE:HRS) has received Type-1 National Security Agency (NSA) certification for its Falcon III® RF-340M multi-channel manpack radio. The certification

Northrop Grumman Enhances VMFT Software

Northrop Grumman Corporation announced that its latest VisionMaster FT (VMFT) software now includes ADMIRALTY Information Overlay (AIO) as an integral element of

OceanSaver Reports Surge in BWT Orders

OceanSaver said it has received a rush of ballast water treatment (BWT) system orders for large vessels. The Norwegian firm, a BWT specialist developing solutions since 2003,

Ship Repair & Conversion

MN 100: Conrad Shipyard

1501 Front Street Morgan City, LA 70380 Telephone: 985 384 3060 E-Mail: rasampey@conradindustries.com Website: www.conradindustries.com CEO/President: Johnny Conrad Number of Employees: 1,

MN 100: BAE Systems Ship Repair

750 W. Berkley Avenue Norfolk, VA 23523 Tel: (757) 494-4674  Email: john.measell@baesystems.com Website: www.baesystems.com/shiprepair President: William Clifford The Company: BAE Systems,

Permanent On-site Collision Damage Repair in Greece

In July Hydrex mobilized a team of diver/technicians to Syros, Greece, for a complex repair operation on a 118-meter, 8550 DWT chemical tanker. The vessel had suffered

 
 
Maritime Standards Offshore Oil Pipelines Pod Propulsion Salvage Ship Electronics Ship Simulators Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0878 sec (11 req/sec)