A&P Falmouth Completes Overhaul

Friday, March 08, 2002
A&P Falmouth has recently completed the lay up and overhaul of the P&O Irish Sea fast ferry Superstar Express. The Austal Ships 82 Catamaran, built for Star Cruises and chartered by P&O Irish Sea, arrived in Falmouth on October 21, 2001 for lay up and then docked on February 6, 2002 for aluminum shell repairs in the forepeak areas; overhaul of the water jets, survey of the main engines, survey of auxiliary machinery, accommodation refurbishment and painting of the hull. The Superstar Express undocked on the 18th February and will go back alongside until mid March when she will return to service with P&O Irish Sea based at Larne. The vessel will operate on the Larne to Cairnryan service from March 15 to September 15, which is the shortest and fastest crossing on the Irish Sea.
Maritime Reporter June 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Ship Repair & Conversion

Bollinger Fourchon: 13 Years Without a Lost Time Accident

Bollinger Shipyards, Inc. announced that their Bollinger Fourchon, L.L.C. facility has worked 13 years without a lost time accident. Building on a philosophy that starts at the top,

Combat Cold Corrossion via Condition Monitoring

Parker Kittiwake explains why frequent condition monitoring is the most effective measure in combating the recent cold corrosion phenomenon The recent trend in

Hyde Marine, Goltens Enter Engineering Agreement

Hyde Marine, Inc., announced today it has launched an agreement with Goltens Green Technologies division to help shipowners determine how to best fit the chemical

 
 
Maritime Careers / Shipboard Positions Maritime Standards Naval Architecture Offshore Oil Pipelines Pod Propulsion Port Authority Ship Repair Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2052 sec (5 req/sec)