A&P Falmouth Completes Overhaul

Friday, March 08, 2002
A&P Falmouth has recently completed the lay up and overhaul of the P&O Irish Sea fast ferry Superstar Express. The Austal Ships 82 Catamaran, built for Star Cruises and chartered by P&O Irish Sea, arrived in Falmouth on October 21, 2001 for lay up and then docked on February 6, 2002 for aluminum shell repairs in the forepeak areas; overhaul of the water jets, survey of the main engines, survey of auxiliary machinery, accommodation refurbishment and painting of the hull. The Superstar Express undocked on the 18th February and will go back alongside until mid March when she will return to service with P&O Irish Sea based at Larne. The vessel will operate on the Larne to Cairnryan service from March 15 to September 15, which is the shortest and fastest crossing on the Irish Sea.

Ship Repair & Conversion

Refit River Cruiser Sets Sail for Crystal

The newly renovated vessel Mozart, which began passenger service in July 2016, marks Crystal Cruises’ first venture into European river cruising.   Before for

California: A Strong Shipbuilding State

Fifth in the nation for direct employment, California shipbuilding and repair industry supports nearly 35,000 jobs; Maritime Administrator highlights economic importance

Damen, Evoqua Team for Innovative BWTS Solution

Two innovators in delivering unique solutions for the maritime sector, Damen Green Solutions and Evoqua Water Technologies will launch the DAMEN BALCON EC 1500

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Standards Naval Architecture Navigation Pod Propulsion Ship Repair Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0634 sec (16 req/sec)