Bender Gets Contract on USS Ticonderoga

Friday, January 25, 2002
Senator Jeff Sessions announced that Bender Shipbuilding & Repair Co., Inc. has been awarded a contract for the drydocking of the USS Ticonderoga, the Navy’s first Aegis Cruiser, presently homeported in Pascagoula, Miss. The vessel’s overhaul is being managed by the Supervisor of Shipbuilding, Conversion in Pascagoula, Miss. for the Department of the Navy. The repairs are scheduled to being in February 2002. The work package includes rudder, shafting, valve, structural and electrical repairs as well as major preservation items that presently total approximately $8 million; employing approximately 125 shipyard workers at the peak of the 120-day contract. Bender has the option pricing in place for additional work that could bring the total package to almost $16 million.
Maritime Reporter September 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

Scanjet Secures 30-ship Tank Management Order

Scanjet Group has followed up its Tank Management order from Stolt-Nielsen with a series of contracts for its ITAMA Intelligent Tank Management concept including Tankcleaning,

Odfjell Finalizes LPG/Ethylene Joint Venture Deal

Following Odfjell SE’s May 16, 2014 announcement declaring the signing of a definitive agreement to form a LPG/E shipping joint venture, Odfjell today announced

Australia, US Order Anti-ship Missile Decoys

Design of the next generation of anti-ship missile decoys is set to commence following the signing of two contracts between the Australian Defense Force and BAE Systems Australia Pty Ltd.

Environmental

NAVTOR, AWT Agreement Marks Next Step in E-navigation

NAVTOR has signed an agreement with maritime weather routing specialist Applied Weather Technology (AWT) that will see the two companies integrating their services

Emissions Scrubber Receives Class Approval

Langh Ship received final class approval from Germanischer Lloyd for its exhaust gas cleaning system on m/s Laura (pictured), a 1996-built a 6,500 DWT general cargo

‘Green’ Hybrid-powered Research Vessel Christened

The Maritime Aquarium at Norwalk christened a larger, “greener” new research vessel on Friday, September 26 in preparation for launching a new era in examining,

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Standards Navigation Offshore Oil Pipelines Pod Propulsion Salvage Ship Electronics Ship Repair
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1163 sec (9 req/sec)