New Volvo Penta Between Regular Runs

Friday, January 11, 2002
MF Vardehorn, a Norwegian car and passenger ferry, was having problems with one of its four propulsion engines. The contract to replace the engine was awarded to Marhaug A/S, Volvo Penta’s dealer in Svolvaer, Norway. The replacement, which involved cutting holes in the ship’s hull to install the new engine, was completed between two scheduled runs by the ferry.

“We are extremely satisfied with the engine replacement and the manner in which Volvo Penta helped us solve our problem. The work was completed quickly, without requiring us to take the ferry out of traffic,” says shipping company inspector Jan Sletteng of TFDS, owner of the MF Vardehorn.

Volvo Penta has been expanding its product program by including marine diesel engines with cylinder volumes ranging from 25 to 65 liters. The expanded engine program has enabled Volvo Penta to compete for contracts that require completely new types of installations. The MF Vardehorn is propelled by four diesel engines connected to a diesel-electric drive system. The ship’s new engine is a 460-kW Volvo Penta D30A MT. The engine replaced a similar machine supplied by another manufacturer that has experienced problems with cavitation in the engine block and excessive wear.

“The new engine was mounted on the existing frame and connected to the existing generator. However, after conducting a fault-tracking test on the old engine, we made certain changes in the installation to solve the problems with cavitation,” says Jan Marhaug of Marhaug A/S. Night work The MF Vardehorn operates in regularly scheduled traffic between Hareid and Sulesund in Sunnmöre. Two ferries service the line, and the engine was replaced at night without any disruptions in scheduled crossings. Careful preparations were made before the ship was brought in for its depot stop on Saturday afternoon. “We cut a hole in the hull at 5:30 in the evening, and the engine was installed early Sunday morning. The ferry was back in operation with three engines for the morning run at 9:30 a.m., and we continued our installation onboard. All four engines were fully functional on Monday, and the ferry was completely back to normal,” says Jan Marhaug.

Maritime Reporter February 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

Holland America Line Heads NOAA's List of Weather Observations

Holland America Line topped the list in 2014 for the World’s Leading Weather Observing Cruise Ship Companies who submitted weather information to the National

Cook Islands to Issue Wreck Removal Certificates

The Cook Islands has acceded to the Nairobi International Convention on the Removal of Wrecks, 2007 (“The Nairobi Convention”). As a State Party, Cook Islands

Richmond Ferry Service to Become a Reality

At its meeting of March 5, the Board of Directors of the Water Emergency Transportation Authority (WETA) approved a Cooperative Agreement with the Contra Costa

Marine Electronics

Rushton Gregory Inks Gemeco Marketing Deal

Rushton Gregory Communications announced today the latest addition to its industry-leading client roster, Gemeco Marine. Based in Lake City, South Carolina,

INTERSCHALT Expands Africa, Asia Service Networks

INTERSCHALT maritime systems AG, the provider of maritime software, services and supplier of Voyage Data Recorders (VDR 4G[e] and s-VDR) has expanded its network

G&D Launches US Subsidiary

German KVM company Guntermann & Drunck GmbH (G&D) announced it will distribute its equipment from new U.S. subsidiary G&D North America Inc. in Miami, Fla.      With

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Maritime Standards Naval Architecture Offshore Oil Salvage Ship Electronics Ship Simulators Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1589 sec (6 req/sec)