New Volvo Penta Between Regular Runs

Friday, January 11, 2002
MF Vardehorn, a Norwegian car and passenger ferry, was having problems with one of its four propulsion engines. The contract to replace the engine was awarded to Marhaug A/S, Volvo Penta’s dealer in Svolvaer, Norway. The replacement, which involved cutting holes in the ship’s hull to install the new engine, was completed between two scheduled runs by the ferry.

“We are extremely satisfied with the engine replacement and the manner in which Volvo Penta helped us solve our problem. The work was completed quickly, without requiring us to take the ferry out of traffic,” says shipping company inspector Jan Sletteng of TFDS, owner of the MF Vardehorn.

Volvo Penta has been expanding its product program by including marine diesel engines with cylinder volumes ranging from 25 to 65 liters. The expanded engine program has enabled Volvo Penta to compete for contracts that require completely new types of installations. The MF Vardehorn is propelled by four diesel engines connected to a diesel-electric drive system. The ship’s new engine is a 460-kW Volvo Penta D30A MT. The engine replaced a similar machine supplied by another manufacturer that has experienced problems with cavitation in the engine block and excessive wear.

“The new engine was mounted on the existing frame and connected to the existing generator. However, after conducting a fault-tracking test on the old engine, we made certain changes in the installation to solve the problems with cavitation,” says Jan Marhaug of Marhaug A/S. Night work The MF Vardehorn operates in regularly scheduled traffic between Hareid and Sulesund in Sunnmöre. Two ferries service the line, and the engine was replaced at night without any disruptions in scheduled crossings. Careful preparations were made before the ship was brought in for its depot stop on Saturday afternoon. “We cut a hole in the hull at 5:30 in the evening, and the engine was installed early Sunday morning. The ferry was back in operation with three engines for the morning run at 9:30 a.m., and we continued our installation onboard. All four engines were fully functional on Monday, and the ferry was completely back to normal,” says Jan Marhaug.

Maritime Reporter September 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

Woman Medevaced from Cruise Ship off SouthWest Pass

The Coast Guard medevaced a 50-year-old woman from a cruise ship 225 miles southeast of Southwest Pass, Saturday. Watchstanders at Coast Guard District 8 received a call at approximately 9 a.

Demands for Icebreaker Tours Spiral

Plans to terminate commercial tours to the North Pole on the nuclear-powered icebreakers of the Atomflot company in 2016 have surged the demand for these tours.

New Chair for Townsville Port

The Palaszczuk Government has appointed one of Queensland’s most respected businesswomen, Renita Garard as the new Chair of the Port of Townsville. In a statement released earlier today,

Marine Electronics

KEP Marine Releases Video Recording Products

KEP Marine releases today the innovative network video recording system and new HD cameras. The plug-and-play KVNR-8001 network video recording system is

MN 100: FloScan Instruments, Inc.

The Company: FloScan is a Seattle-based corporation that designs and manufactures its products in the United States. With worldwide sales at an all-time high,

Smart Box Ship Features Built-in Container Tracking

CMA CGM Bougainville is billed as the first containership in the world to be equipped with TRAXENS technology, which transforms containers into smart, connected objects.

Maritime Contracts Maritime Security Maritime Standards Navigation Pipelines Pod Propulsion Salvage Ship Simulators Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1650 sec (6 req/sec)