New Volvo Penta Between Regular Runs

Friday, January 11, 2002
MF Vardehorn, a Norwegian car and passenger ferry, was having problems with one of its four propulsion engines. The contract to replace the engine was awarded to Marhaug A/S, Volvo Penta’s dealer in Svolvaer, Norway. The replacement, which involved cutting holes in the ship’s hull to install the new engine, was completed between two scheduled runs by the ferry.

“We are extremely satisfied with the engine replacement and the manner in which Volvo Penta helped us solve our problem. The work was completed quickly, without requiring us to take the ferry out of traffic,” says shipping company inspector Jan Sletteng of TFDS, owner of the MF Vardehorn.

Volvo Penta has been expanding its product program by including marine diesel engines with cylinder volumes ranging from 25 to 65 liters. The expanded engine program has enabled Volvo Penta to compete for contracts that require completely new types of installations. The MF Vardehorn is propelled by four diesel engines connected to a diesel-electric drive system. The ship’s new engine is a 460-kW Volvo Penta D30A MT. The engine replaced a similar machine supplied by another manufacturer that has experienced problems with cavitation in the engine block and excessive wear.

“The new engine was mounted on the existing frame and connected to the existing generator. However, after conducting a fault-tracking test on the old engine, we made certain changes in the installation to solve the problems with cavitation,” says Jan Marhaug of Marhaug A/S. Night work The MF Vardehorn operates in regularly scheduled traffic between Hareid and Sulesund in Sunnmöre. Two ferries service the line, and the engine was replaced at night without any disruptions in scheduled crossings. Careful preparations were made before the ship was brought in for its depot stop on Saturday afternoon. “We cut a hole in the hull at 5:30 in the evening, and the engine was installed early Sunday morning. The ferry was back in operation with three engines for the morning run at 9:30 a.m., and we continued our installation onboard. All four engines were fully functional on Monday, and the ferry was completely back to normal,” says Jan Marhaug.

Maritime Reporter March 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

5th Floating Accommodation for Lerwick

A further accommodation ship, Ocean Atlantic, is due at Lerwick on Monday 27 April 2015 and is on its way from Portland in Dorset. As with the other floating accommodation at the port,

Double Order for Super Gloria Reachstacker

Kalmar, part of Cargotec, has gained an order for two Super Gloria reachstackers from Tadarsa Logistics S.L. in Aviles, Spain. The largest reachstackers ever built,

BIMCO Welcomes EU Decision on Migrants

BIMCO has stated today that it appreciates the new efforts by EU leaders to reduce increasing reliance on merchant shipping to rescue the growing numbers of

Marine Electronics

HMS Prince of Wales Bridge Sets Sail

The bridge section of the second Queen Elizabeth Class aircraft carrier set sail today from Glasgow on its first sea voyage to Rosyth.   Upper Block 07 is where

Huat Retires as Non-Ex Dir. of ST Engineering

Singapore Technologies Engineering Ltd (ST Engineering) today announced the retirement of Mr Quek Poh Huat as non-executive Director of the Company at its Annual General Meeting on 23 April 2015.

GOST System Tracks Stolen Boat in Abacos

GOST (Global Ocean Security Technologies), celebrating its 10th year as a world leader in marine security, tracking, monitoring and video surveillance systems,

 
 
Maritime Careers / Shipboard Positions Maritime Security Naval Architecture Navigation Offshore Oil Pipelines Ship Electronics Ship Simulators Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1504 sec (7 req/sec)