VT Halter Launches Ferry

Thursday, February 26, 2004
VT Halter Marine Inc., a subsidiary of Vision Technologies Systems Inc., launched a 95-foot sea-going ferry from its Mississippi-based Pascagoula Operations. Christened the Caribeña, the all-aluminum vessel was designed and built by VT Halter Marine for the Puerto Rico Port Authority. Capable of carrying 272 passengers, the Caribeña will provide inter- island transportation for the Fajardo-Vieques-Culebra Ferry Line. It will be U.S. Coast Guard classed sub-chapter “K” and U.S. flagged. VT Halter Marine plans to complete and deliver the Caribeña during the second quarter of 2004. It could take 10 or more days to make the 1600- mile trip to the Caribeña’s home at the Port of Fajardo, a city located on the east side of the Island of Puerto Rico. Boyd King, CEO said, "The Caribeña represents VT Halter Marine’s experience, skills, commitment to quality and its ability to design and build a wide variety of commercial and defense-related vessels. VT Halter Marine leverages its experience, best practices and technological advancements from across its diverse product lines and produces vessels that are tailored to the unique requirements of each customer.” VT Halter Marine Inc., based in Gulfport, Miss., is a leader in the design and construction of small- to medium-sized ships in the United States. VT Halter Marine designs, builds and repairs a wide variety of ocean-going vessels such as patrol vessels, oil recovery vessels, oil cargo vessels, ferries, logistic support vessels and research ships.

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter April 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Passenger Vessels

Raytheon Anschütz Steering Gear Control for Luxury Cruise Ships

The German navigation system manufacturer Raytheon Anschütz was awarded a retrofit contract of steering gear control systems for two luxury cruise ships chartered by Noble Caledonia Ltd.

Ferry Drydocking Completed on 2-day Turnaround

Great Lakes Shipyard hauled out the Kelleys Island Ferry Kayla Marie on April 18 for its USCG five-year inspection survey. The yard completed all work, and refloated the vessel two days later,

113 Migrants Drown in Libya-Italy Weekend Transits

An estimated 113 people died in four shipwrecks between Libya and Italy at the weekend as the crossing becomes the preferred sea route for migrants to Europe, the

 
 
Maritime Contracts Maritime Security Naval Architecture Navigation Offshore Oil Ship Electronics Ship Repair Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0681 sec (15 req/sec)