Queen Mary 2 Sets Sail with GE LM2500s

Tuesday, January 13, 2004
The world’s largest transatlantic liner, the Queen Mary 2, set sail on its maiden voyage powered by two GE LM2500+ aeroderivative gas turbine-generator sets and four diesel generator-sets. The new flagship of the British merchant fleet, owned by Cunard Line, will take 14 days to sail from Southampton in the United Kingdom to Fort Lauderdale, Fla. A special highlight of Queen Mary 2’s inaugural schedule will be her maiden eastbound crossing from New York on April 25 as both Queen Mary 2 and Queen Elizabeth 2 sail in tandem. This will be the first time two Cunard Queens will have berthed in the port together since March 1940.

“We are delighted that our LM2500+ gas turbines were selected to power this elegant and historic achievement in naval architecture and engineering,” said Karl Matson, general manager of GE Marine. “This project also marks a milestone for GE, as the LM2500+ gensets are being used for the first time in a ‘dual gas turbine’ installation on a cruise ship in a combined diesel and gas turbine arrangement. The powerful LM2500+s enable the ship to meet its maximum speed of 30 knots,” Matson added.

Gas Turbines

The two GE LM2500+ aeroderivative gas turbine-generators for the Queen Mary 2 are used in a COmbined Diesel And Gas (CODAG) propulsion system with four diesel generator-sets. The gas turbines were manufactured at GE Marine’s Evendale, Ohio facility; the generator sets were packaged by GE Energy in Houston, Texas.

Each gas turbine-generator set contributes 25 megawatts to the ship’s overall 118 megawatts of installed power. Power produced in this electric drive configuration is used for propulsion as well as onboard power. GE specially designed the two LM2500+ packages for Chantiers de l’Atlantique, the Queen Mary 2 shipyard, to be some 35 tons lighter than previous LM2500+ marine gas turbine installations.

According to Chris Dalston, manager of commercial marine sales for GE Energy, “What makes this application unique is that the compactness and low noise and vibration characteristics of the packages. These design features allowed the shipbuilder flexibility, especially with respect to the placement of the gas turbine gensets. The volume and weight of ducting for the combustion intake, exhaust and package ventilation are significantly reduced, thereby increasing the ships’ available space for cabins and public areas.”

The redesigned package also features the next-generation Woodward Micro Net Digital Control turbine control system. The controls manage all the systems of the package, including engine fuel management, package sequencing, package condition monitoring and interfacing to other systems aboard the ship.

Maritime Reporter January 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

Coldharbour Marine's New UK Office

Coldharbour Marine, long recognised for the design, manufacture and supply of inert gas and fluid handling equipment vessels (FPSOs) has moved into a new 25k sq.

Bangladesh Aims to be World's 'First Solar Nation

Residents of Islampur, a remote village in the northern Bangladeshi district of Naogaon, were stunned one night last summer when the darkness was suddenly illuminated

India Not Pressurized by US-China Deal

Indian Prime Minister Narendra Modi said a climate deal between the United States and China does not put pressure on India, but that global warming itself was reason to take action.

Marine Propulsion

Xunlong Shenzhen Orders Dutch-designed Ferry

CoCo Yachts B.V. inks contract with Xunlong Shenzhen Ferry Company for one Coastal Cruiser 300 Xunlong Shenzhen Ferry Company has ordered a Coastal Cruiser 300 ferry from CoCo Yachts,

Lindner Sees Strong 2015

On the last day of what proved to be a busy Workboat show in New Orleans, Mikael Lindner, President, Scania North America, sat with Maritime Reporter & Engineering

Vane Brothers Orders Two Tugs from Chesapeake

Chesapeake Shipbuilding has signed a contract with Vane Brothers to build two new tugs, marking the 13th and 14th tugs that Chesapeake will have built for Vane Brothers in the last several years.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Naval Architecture Pod Propulsion Salvage Ship Electronics Ship Repair Ship Simulators Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2309 sec (4 req/sec)