A&P Busy in the Ferry Refit Season

Thursday, January 08, 2004
The various yards in A&P are well into the ‘ferry refit’ season, with the latest contract being Irish Continental Lines’ 50,938 grt passenger/car ferry Ulysses, which is currently in A&P Birkenhead. This yard is also currently repairing NorseMerchant Ferries’ 9,368 grt Merchant Bravery. The largest ferry project currently underway in the A&P Group, is the modification of the 24,688 grt, 2002-built RoRo vessel Stena Foreteller at A&P Tyne’s Hebburn shipyard. The vessel, the former Cetam Massilia, is owned by Sweden’s Stena RoRo AB, and managed by the Stena’s Northern Marine Management, Glasgow. The contract involves major modifications to the purifier room entailing relocating this equipment to a newly-created machinery space within the lower car hold. Additionally there is to be a new exhaust gas economizer package fitted into the existing engine room uptake spaces, and new emergency escapes from the lower car hold are also to be installed. There is also a comprehensive drydocking and repair schedule, including routine mechanical overhaul, survey works and hull painting. She entered the yard during early December and will sail after commissioning of the boiler and purifier equipment in mid-January 2004. Meanwhile, A&P Tyne is currently carrying out regular refit work onboard the two P&O Ferries’ vessels, the 28,559 grt Pride of Provence, already arrived, to be followed by the 13,061 grt Pride of Bruges. A&P Falmouth is expecting the 37,583 grt Pride of Bilbao and the 28,833 grt Pride of Acquitaine, and is also currently refitting the 22,986 grt European Seaway and the fast-ferry Portsmouth Express. In A&P Southampton, the 14,760 grt Pride of Cherbourg is due after the completion of Wightlink’s 764 grt sisterships Caedmon and Cenwulf, and the 2,983 grt St Helen.
Maritime Reporter July 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Ship Repair & Conversion

Ecospeed Fuel and Cost Saving Solutions at SMM

Ecospeed announced it will exhibit its line of fuel and cost saving solutions at SMM in Hamburg. Ecospeed and fuel savings Routine in-water cleaning results

Crippled Pine Galaxy Arrives in San Francisco

The disabled mixed-products tanker Pine Galaxy arrived in San Francisco for repairs Wednesday. Commercial tugs towed the ship safety into the Port of San Francisco

Disabled Tankship 'Pine Galaxy' Arrives San Francisco

According to the US Coast Guard, the disabled mixed-products tanker 'Pine Galaxy' has arrived in San Francisco for repairs. Commercial tugs towed the ship safety

 
 
Maritime Security Maritime Standards Naval Architecture Pipelines Salvage Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 3.8755 sec (0 req/sec)