Vopak Expands Bunker Capacity

Thursday, November 06, 2003
Vopak is extending its capacity for discharging and loading bunker oil. The construction of a third bunker jetty and the extension of the terminal pipeline with two 24-inch lines have to be finished before summer. The project must end the delays at the terminal at peak moments. The entrance of the new Argos Terminal also expects relaxation of the stressed bunker market, by the end of the year.
Maritime Reporter October 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Marine Power

An Efficient Addition to a Strong Fleet

Cvitanovic towing of Belle Chasse, Louisiana has taken delivery of a fourth vessel for its fleet of highly efficient Lugger-style tugs. Built at the Rodriguez yard in Bayou LaBatre,

US Orders Trawler with Common-Rail Technology

Tier II-compliant 32/44CR technology to deliver fuel efficiency, low emissions and improved productivity   MAN Diesel & Turbo has received an order for an MAN

Sea Star Line: Equipment Replacement Plan on Track

Company Receives New Refrigerated Containers and Places Order for New Genset Equipment   Sea Star Line, LLC began receiving the first of its new 100 40’ and 45’

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Navigation Pod Propulsion Port Authority Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0944 sec (11 req/sec)