BV to Class LNG Carrier

Monday, October 06, 2003
International classification society Bureau Veritas has been chosen to class the 153,500 cu m LNG carrier ordered by Gaz de France from Chantiers de l'Atlantique this week. This is the largest ever LNG carrier and is due for delivery in 2005. The order includes an option for a second vessel. BV helped develop the concepts for the vessels, and developed unique new rules to allow the yard and owners to break new technological frontiers. "BV has consistently been the world leader in LNG carriage, since development of membrane LNG carriers was first begun," says Bruno Dabouis, commercial manager of BV's marine division. "Now we will class these new vessels, which are a quantum leap forward in cost-effective LNG transportation. The innovative features in these ships will set the benchmark for the rest of the world to live up to." The ships have two key innovations. The traditional steam turbine plant will be replaced by a low-pressure dual fuel diesel electric system, and the cargo gas will be carried in the new GTT CS1 membrane system. BV co-operated with Wärtsilä for the development of the safety concept of the low-pressure dual fuel diesel/gas engine, and has issued new rules for such engines. These are unique, and set new standards for this type of machinery plant. BV also co-operated with GTT on the complex calculations and modeling needed to develop the cost-effective CS1 containment system. CS1 was granted BV concept approval in 2002. The dual fuel diesel electric propulsion system offers several advantages. As a more compact installation, it allows the shipyard to maximize cargo space in the hull. It will reduce gas consumption compared to the conventional turbine installations. Operators will have more flexibility with respect to crewing, as engineers familiar with turbine installations are now in short supply. Maintenance is simplified as generator sets can be taken off line and maintained on passage. Machinery redundancy is enhanced, cutting the risk of a power failure. The CS1 containment system combines the best features of the proven Mark III and NO96 membrane systems. It offers increased strength, faster fabrication, and a cost reduction of 15 per cent compared to existing systems. Partial loading conditions are also possible, improving operational flexibility.
Maritime Reporter November 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

LNG

Liquefaction Terminals to Dominate LNG Capital Expenditure

Capital expenditure (Capex) on global LNG facilities is expected to total $259 billion (bn) over the period 2015-2019, with investments expected to be 88% larger

Wärtsilä to Begin Building LNG Terminal in January

Wärtsilä has been given full notice to proceed (NTP) from Manga LNG Oy for the supply of a liquefied natural gas (LNG) import terminal in Tornio, Northern Finland.

EGAS Tenders for as many as 48 LNG Cargoes

Egypt's state-owned gas company EGAS has tendered to buy at least 48 cargoes of liquefied natural gas (LNG) for delivery in 2015/16, three traders said. A senior

 
 
Maritime Contracts Maritime Standards Naval Architecture Offshore Oil Port Authority Salvage Ship Electronics Ship Repair Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1110 sec (9 req/sec)