NASSCO Starts Construction On First T-AKE Ship

Tuesday, September 30, 2003
National Steel and Shipbuilding Company (NASSCO) has begun construction on the first ship in the T-AKE program, a new class of combat logistics force ships designated the Lewis and Clark class. "The T-AKE is the first new combat logistics force ship designed for the Navy in almost 20 years," said Richard Vortmann, president of NASSCO. "It is the first to combine lower-cost commercial ship design features with high-performance, proven international marine technologies such as integrated electric-drive propulsion." The T-AKE is a dry cargo/ammunition ship that will be operated by the Military Sealift Command. An underway replenishment ship, the T-AKE will support the Navy's Sea Power 21 vision of seabasing, providing logistic lift from sources of supply either in port or at sea and transferring cargo - ammunition, food, fuel, repair parts, and expendable supplies and material - to station ships and other naval forces at sea. With convertible cargo holds and cargo transfer systems capable of handling food and stores or ammunition, the T-AKE will replace two classes of aging cargo ships that are nearing the end of their service lives: T-AE ammunition ships and T-AFS combat stores ships. To date, NASSCO has been awarded contracts with a total value of $1.3 billion to build four Lewis and Clark-class ships. NASSCO's T-AKE contract has options exercisable by the Navy for eight additional ships over the next five years for a potential contract value of approximately $3.7 billion. If all options are exercised, the program will give NASSCO a firm backlog through 2010 and provide jobs for 1500-1800 production employees during that period. The T-AKEs will be 689 ft. (210 m) in length and 105.6 ft. (32.2 meters) in beam, with a design draft of 9.12 meters (29.9 feet). The ships will carry almost 7,000 metric tons of dry cargo and ammunition and 23,500 barrels of marine diesel fuel. The T-AKEs have been designed to maximize cargo-handling efficiency and minimize the costs of operation and maintenance over their expected 40-year life. NASSCO is a leading builder of auxiliary and support ships for the Navy.
Maritime Reporter July 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

BAE Systems Awards Software Contract to SENER

The Spanish company SENER, Ingeniería y Sistemas S.A has closed a contract with U.K.-based BAE Systems PLC for the integration between FORAN CAD/CAM System and

Hawboldt Secures Cape Sharp Tidal Winch Deal

A third Nova Scotian company has secured a multimillion dollar contract with the Cape Sharp Tidal project, which has potential to be the first grid-connected tidal array in the world.

Voyager IP Wins Irish Navy Satellite Contract

Voyager IP, the Irish marine telecoms solutions specialist, has partnered with the Irish National Space Center to win a €500,000 contract to manage the entire satellite

Navy

BAE Systems Awards Software Contract to SENER

The Spanish company SENER, Ingeniería y Sistemas S.A has closed a contract with U.K.-based BAE Systems PLC for the integration between FORAN CAD/CAM System and

Voyager IP Wins Irish Navy Satellite Contract

Voyager IP, the Irish marine telecoms solutions specialist, has partnered with the Irish National Space Center to win a €500,000 contract to manage the entire satellite

Rolls-Royce Power Package for USS Zumwalt

Rolls-Royce announced delivery of the twin fixed pitch propellers to Bath Iron Works for installation on the U.S. Navy’s most modern surface combatant, the future USS Zumwalt,

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Navigation Pipelines Pod Propulsion Port Authority Salvage Ship Electronics Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1196 sec (8 req/sec)