CAE Awarded U.S. Navy Contracts

Tuesday, August 12, 2003
CAE has been selected to supply electric plant control systems for the largest and most advanced warship in naval history, the Nimitz-class aircraft carrier USS George H.W. Bush (CVN 77), as well as for the U.S. Navy’s latest LPD 17 class amphibious ship, the USS New York (LPD 21). The total value of these contracts is approximately C$12 million. CAE will provide prime contractor Northrop Grumman Newport News with computer-based control system technology for the USS George H.W. Bush. CAE will also work with Raytheon’s Integrated Defense Systems to supply an engineering control system (ECS) when construction starts for USS New York, the fifth ship in the San Antonio class of amphibious transport dock ships. “The benefits of our state-of-the-art technology are highly valued by the U.S. Navy,” said Rashid Khan, CAE’s executive vice-president of marine controls. “And, as it continues to modernize its fleet, CAE will be there to support the Navy’s efforts to project the most effective force in the world.” The George H.W. Bush is the U.S. Navy’s 10th and last Nimitz-class aircraft carrier and is currently under construction in Norfolk, Virginia. The U.S. Navy plans to build up to twelve 208-m, 25,000-ton San Antonio-class amphibious transport dock ships in a continuing modernization of its expeditionary forces. CAE was previously awarded a Navy Excellence Award for its efforts in connection with the program.
Maritime Reporter August 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

Rosneft says Exxon Still Continues to Work With it in Arctic

Russia's biggest oil producer Rosneft said on Saturday that Exxon Mobil was still continuing exploration drilling at their joint project in the Arctic Kara Sea.

ICC Conference Focuses on Platform to Settle Disputes

The 5th ICC International Commercial Mediation Conference has brought together leading mediators, arbitrators, corporate managers and in-house counsel from around

Keystone XL Costs to Nearly Double - TransCanada

The total cost of TransCanada Corp's controversial Keystone XL pipeline is likely to nearly double following six years of regulatory delays, a company spokesman said on Friday.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Maritime Standards Navigation Port Authority Ship Repair Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1375 sec (7 req/sec)