Clamp Supplier Dives into Project

Wednesday, April 18, 2001
Bluefin Robotics Corp. called on Clampco — a manufacturer of stainless steel T-bolt band clamps and V-band couplings — when it needed help "testing the waters." Bluefin specializes in manufacturing underwater robotic equipment for offshore survey, military, and scientific research customers.

By working with Clampco Products Inc., Bluefin was able to complete an underwater robotics project for the U.S. Navy in record time. Bluefin designed, built, tested, and demonstrated its AUV (Autonomous Underwater Vehicle) for the Coastal System Station and the Office of Naval Research in approximately eight months — half the time typically required for projects of a similar scale. Sam Tolkoff, engineer at Bluefin, attributes this rapid development to one of its suppliers, Clampco Products, Inc. "We considered several other suppliers when we first looked into the project," says Tolkoff. "However, Clampco was able to offer us the best lead time, and this is exactly what we needed - fast delivery as well as special attention and support for our design requirements." Clampco handles special requests as a matter of course. For instance, Tolkoff's team needed to design the AUV with robust modular joints, which would let operators disassemble the equipment in two directions. They could either remove panels from the AUV or interchange the tail section with the top sections of 10 other vehicles. A V-band coupling is a fastener that offers this type of flexibility. But Bluefin had special design considerations above and beyond the standard V-band coupling. Tolkoff worked with Carl Klaus, sales engineer at Clampco, regarding Bluefin's custom requirements. Typically, V-bands have a gap under the latch mechanism to facilitate installation. However, the Bluefin engineers wanted to reduce the gap to increase total surface contact with the flanges. So Clampco simply rotated the position of the retainer segments so that the ends of the segments would sit under the latch.

To improve the coupling's corrosion resistance in the harsh salt-water environment, Clampco used 316 stainless steel bands.

Maritime Reporter October 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Offshore

Woodside to Pick up Moroccan Acreage

Woodside advises that it has entered into a contract for an exclusive Reconnaissance Licence (RL) with the Office National des Hydrocarbures et des Mines, the

Strategy Can Maximize UKCS potential

Companies operating in the North Sea require a cultural shift to make the most of the its potential, according to a new report from Deloitte, the business advisory firm.

Pile Testing for Wikinger Wind Farm Launched

In October 2014 the first phase of the pile testing campaign for the Wikinger offshore wind farm project was launched after the site’s geotechnical investigation on the Baltic Sea had been completed.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Offshore Oil Pipelines Port Authority Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1301 sec (8 req/sec)