Fog May Pose Threat to Gulf Coast Shipping

Monday, April 23, 2001

Fog, which has shrouded parts of the U.S. Gulf of Mexico coast in recent weeks, could remain an intermittent threat to shipping and crude oil imports through April, according to a government meteorologist.

In February, March and April sea fogs can form quickly along the Gulf coast as warm moist air heading in from the Gulf hits cooler coastal waters, causing the moisture to condense.

“All of a sudden it’s like you drive into a brick wall and the visibility goes down to a sixteenth of a mile. Most ships don’t do much traveling in that,” said National Weather Service meteorologist Kent Prochazka.

It’s a phenomenon that can disrupt the steady traffic of crude oil tankers to Gulf Coast terminals and refining centers such as Corpus Christi, Houston, and Beaumont/Port Arthur in Texas and Lake Charles and New Orleans in Louisiana.

Under normal circumstances the U.S. Gulf Coast is the entry point for some six million barrels a day of crude oil, or roughly two thirds of the nation’s total imports. The country imports about nine million of the 15 million barrels it consumes each day.

But in the week that ended Feb. 16, persistent fog kept many tankers offshore and unable to offload their cargoes of crude oil, cutting Gulf coast imports to just over two million barrels, according to the U.S. Department of Energy.

Gulf coast fog was cited as the main reason for a huge 12-million-barrel decline in U.S. crude oil inventories that week, and recurring patchy fog prevented a rapid rebound in inventories the following week, contrary to many analysts’ expectations.

Suspicions that fog-related supply problems were pinching Gulf coast refiners were confirmed when the U.S. Department of Energy said it had rejected tentative requests from several refiners for oil from the Strategic Petroleum Reserve (SPR).Although the 540-million-barrel reserve was created for use in case of a national supply emergency, the Clinton administration approved the release of SPR oil to two refineries in Lake Charles last summer when an obstruction in a local shipping channel prevented the passage of oil tankers.

Lynn Hohensee, a spokesman for Conoco Inc., one of the companies that received SPR oil last summer, said Conoco had asked the government about obtaining more SPR last week because fog had delayed tanker deliveries. After the request was turned down, conditions improved and the company was able to bring the first of two fog-delayed crude oil tankers into its terminal, Hohensee said.

Jeff Goetz of consulting firm Poten & Partners said fog last month had delayed crude tankers seeking to enter the Houston Ship Channel for several days, causing a chain of events that had pushed up rates for tankers to the U.S. Gulf of Mexico. “Tankers were unable to make their next scheduled lifting of crude, they had to be replaced and that led to the rise in rates,” he said.

Several analysts said that while fog might throw the U.S. oil market off balance for a while, its impact would not endure. “I think it’s a short-term weather phenomenon, that will play itself out. I don’t think there is a long-term problem,” said Houston-based analyst Alan Struth. — (Reuters)

Maritime Reporter March 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

CNR: Innovation Maintains US Naval Advantages

An interview with Rear Adm. Matt Klunder, U.S. Navy Chief of Naval Research What are your near term, mid-term and long term science and technology (S&T) objectives?

Unique Technologies Improve Port Security

Practical results from the SUPPORT (Security UPgrade for PORTS) project, coordinated by BMT Group Ltd. and part-funded by the European Commission’s FP7 Security

CMM Takes Delivery of Damen PSV for Brazil

New supplier CMM Gravity to start on long-term contract with Petrobras. CMM has taken delivery of a Damen Platform Supply Vessel 3300. The 80-meter, 3,300t deadweight

Navigation

Reminder Stresses Importance of Accurate Clearance Information

The Captain of the Port, New York-New Jersey, has issued a reminder about the importance of providing accurate clearance information, and warns that civil penalties

NOAA Begins Hydrographic Survey Season

New data will update nautical charts around the country. As sure as spring arrives, NOAA vessels and independent contractors are hitting the seas for the nation's

Air Draft Alert: Bayonne Bridge Struck Twice this Year

The Bayonne Bridge is undergoing a two-year construction project to raise the roadway an average of 65 feet. The Captain of the Port, New York-New Jersey says that

 
 
Maritime Careers / Shipboard Positions Maritime Security Naval Architecture Navigation Offshore Oil Pod Propulsion Salvage Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1664 sec (6 req/sec)