3-D Approach Aids Ship Production

Friday, September 28, 2001
Genoa Design International has completed the structural production work pack for an aluminum-built Canadian Coast Guard Buoy-tending vessel. Genoa Design's 3-D modeling approach used in the structural production phase of the project led to significant efficiencies for the vessel's builder, C&W Industrial Fabrication and Marine Equipment Ltd., located in Bay Bulls, Newfoundland. After initial team planning, the detail designers and drafters at Genoa Design used ShipConstructor production software to create a 3-D model of the Coast Guard vessel. The combination of C&W's engineering staff along with Genoa's off-site professional expertise and sophisticated software resulted in several benefits and overall, the process integrated well with C&W's progressive approach to lean manufacturing. The ShipConstructor software database aided in the creation of an efficient parts numbering system, whereby any part cut from aluminum plate could be traced to the nest drawings, and the mill certificate could be sited. Since the vessel was built in panel assemblies, C&W maximized the use of its shop floor in conjunction with other projects. C&W's project leader said, "We were pleased with the results of the 3-D modeling process. Using ShipConstructor, Genoa delivered drawings for panel assemblies that fit together exactly to create the final hull assembly. The resultant precision of building a vessel from drawings and information based on a 3D- model enabled us to reduce assembly time. There was virtually no rework and no experimental 'fit-up' time required."
Maritime Reporter March 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

Obangame Express 2015 Concludes in the Gulf of Guinea

Maritime forces from Gulf of Guinea nations, Europe, South America, and the United States and several regional and international organizations concluded the multinational maritime exercise,

Scandlines Ferry Back in Service by End June

The damaged Scandlines ferry M/V Prinsesse Benedikte is being repaired at the Polish shipyard Remontowa and is expected to be ready before the end of June 2015.

Greece Will Sell Piraeus Port Stake in Weeks

The Greek government will sell its majority stake in the port of Piraeus within weeks, the country's deputy prime minister told China's official Xinhua news agency,

Technology

US Navy to Roll out Underwater Spy Satellites

The robotic series that remade crusade in skies will shortly extend to a low sea, with underwater view “satellites,” drone-launching pods on a sea building and unmanned ships sport submarines,

India May Add Japanese Soryu-Class Submarines to its Fleet

India is reportedly considering a project to incorporate six Japanese Soryu-class diesel-electric submarines into its fleet, says The Japan Times.   The Defense

Austal Graduates 48 4-Yr Apprentices

Austal USA combined two classes to graduate a total of 48 members of Austal’s cutting-edge four-year apprenticeship program yesterday at a formal ceremony held at the Arthur R.

 
 
Maritime Careers / Shipboard Positions Maritime Standards Offshore Oil Pipelines Port Authority Salvage Ship Electronics Ship Repair Ship Simulators Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1536 sec (7 req/sec)