Woodside Begins Construction of Pluto LNG Project

Tuesday, November 27, 2007
Woodside Petroleum has begun construction of the Pluto liquefied natural gas project. The first phase of the Pluto project will include a single liquefied natural gas (LNG) production train with forecast production of 4.3 million tons per annum (mtpa) (4.8 mtpa at 100% capacity) connected by a 180km, 36-inch offshore pipeline to a platform in 85 meters of water. Site preparation has been underway since January 2007, after Woodside received environmental and heritage approval to begin work on the project's storage tanks and export facility. Preparation work for the gas processing plant, where the production train will be located, has also started, according to Woodside. The platform is to be connected to five subsea big bore wells on the Pluto field, with first gas expected to be produced in late 2010.
Maritime Reporter September 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Navy

Mount Whitney Departs Batumi, Georgia

The U.S. 6th Fleet command and control ship USS Mount Whitney (LCC 20) departed Batumi, Georgia, Oct. 18 after completing a successful port visit. While in Batumi,

USS Constitution Not to Set Sail Until 2018

The crew of USS Constitution embarked on their final Boston Harbor underway demonstration aboard Old Ironsides this year, Oct. 17. Constitution set out into

US Navy to Christen Littoral Combat Ship Detroit

The Navy will christen littoral combat ship (LCS) Detroit, on Oct. 18 during a ceremony at Marinette Marine Corporation shipyard in Marinette, Wisconsin. Secretary of the Navy Ray Mabus,

LNG

New Standard for LNG Cargo Containment Systems

Wilhelmsen Technical Solutions (WTS) said it has successfully completing the gas trial for the first LNG carrier built to a Boil Off Rate (BOR) of 0.08% per day.

LNG America, Buffalo Marine to Design LNG Bunker Fuel Network

LNG America announced it has entered an agreement with Buffalo Marine Service, Inc. (Buffalo Marine) to cooperate on the design of an LNG bunker fuel network for the U.

World’s 1st LNG Hybrid Barge Christened "Hummel"

The world’s first LNG hybrid barge of Becker Marine Systems was christened with the name "Hummel" on October 18, 2014, at Grasbrook Quay in HafenCity Hamburg.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Maritime Standards Naval Architecture Pipelines Ship Electronics Ship Simulators Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1216 sec (8 req/sec)