Wärtsilä Wins UK Aircraft Carrier Contract

Wednesday, December 12, 2007
Wärtsilä will supply main diesel generating sets and their auxiliary and support systems for the Royal Navy's Future Aircraft Carriers. (Photo: Thales)

Wärtsilä has been awarded the contract for approx EUR 30 million for the manufacture and supply of the main diesel generating sets and their auxiliary and support systems for the Royal Navy's Future Aircraft Carriers (CVF) by Thales Naval Division on behalf of the Aircraft Carrier Alliance. The contract award was marked by a ceremony held on HMS Victory in Portsmouth Naval Base, UK, on 30 November 2007.

The main diesel generating sets will form part of the Integrated Electric Propulsion (IEP) system. The selected prime movers of the generating sets are two 12-cylinder and two 16-cylinder Wärtsilä 38 engines for each ship and will supply 40 MW of the total installed power of over 100 MW, the remainder coming from two gas turbine alternators. They will be the largest diesel engines ever supplied to the Royal Navy. The first ship set of diesel generators will be delivered in 2009, with the equipment for the second ship following in 2011.

The CVF carriers, HMS "Queen Elizabeth" and HMS "Prince of Wales", will have a displacement of around 65,000 tonnes and length of 284 metres. They will be the largest and most powerful warships ever built in the United Kingdom. The hulls are being planned for a 50-year service life and the ships will be built in modules by selected naval shipbuilding yards around the UK with final assembly in Rosyth. Each ship will have a complement of typically 1450 including aircrew, and will support around 40 aircrafts including the Joint Strike Fighter and Airborne Early Warning aircraft.

Maritime Reporter November 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

Wärtsilä to Begin Building LNG Terminal in January

Wärtsilä has been given full notice to proceed (NTP) from Manga LNG Oy for the supply of a liquefied natural gas (LNG) import terminal in Tornio, Northern Finland.

Polarcus Awarded 3D Project Off West Africa

Polarcus Limited has signed a letter of intent with Perenco Oil & Gas Gabon S.A. for a 3D marine seismic acquisition project offshore West Africa.   The project,

Boskalis, VolkerWessels Win Offshore Wind Farm Work

Royal Boskalis Westminster N.V., in partnership with Volker Stevin International (VolkerWessels), has been awarded a contract by Iberdrola Renewables Offshore Deutschland

Maritime Security

Damen Outfitting First of Nine Bahamas Patrol Boats

The first of nine Damen Stan Patrol 3007s ordered by the Royal Bahamas Defense Force has arrived at Damen Shipyards Gorinchem in the Netherlands for outfitting.

USCG on Cuba Policy Changes

The U.S. Coast Guard missions and operations in the Southeast remain unchanged. The Coast Guard strongly discourages attempts to illegally enter the country by taking to the sea.

NASSCO Opens Bremerton Repair Facility

General Dynamics NASSCO celebrated the grand opening of its new location in Bremerton, Wash., yesterday. The facility will support the company’s recently-awarded contract to repair and maintain U.

 
 
Maritime Contracts Maritime Security Maritime Standards Naval Architecture Navigation Pod Propulsion Ship Electronics Ship Repair Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1274 sec (8 req/sec)