Four Costa Ships in Drydock

Monday, December 17, 2007
Costa Crociere continues to make investments to keep its fleet operating at the highest quality standards. Between November and December 2007 no less than 4 ships in the Italian company’s fleet, Europe’s biggest and most modern, were placed in dry-dock to carry out technical maintenance and restyling operations worth a total of 15 million euros.

The works were carried out in the dry-docks of the ports of Genoa and Palermo: the Costa Victoria (from 13 to 23 November) was the guest of the Mariotti shipyards in Genoa; the Costa Marina (from 13 to 25 November) was placed in dry-dock no. 5 of the port of Genoa; the Costa Concordia (from 4 to 14 December) and the Costa Classica (from 20 November to 1 December) were overhauled in the Fincantieri dry-docks of Palermo. The main objective of these operations, which for Costa’s ships are carried out an average of every two and half years, is to perform routine and extraordinary maintenance on the ship’s technical systems and its furnishings. The main purpose of all the various operations is to ensure that the quality and safety of Costa’s ships remains at the highest levels, in both crew and guest areas.

Hull maintenance is one of the most important operations carried out during this kind of ship “check-up”. During these operations the hull, whose length on these vessels ranges from 174 metres (Costa Marina) to 290 metres (Costa Concordia), is completely cleaned and painted to prevent it from eroding due to the effect of atmospheric agents and the sea and to improve its performance at sailing speeds. Instead, for the hotel part, the layout of the public areas and the cabins is completely restyled, replacing furnishings, carpeting, curtains, fabrics, wall linings and, this time, also replacing the cathode ray television sets in the suites with new and modern LCD screens. For what concerns the outer decks, the flooring was replaced with teak. After completing the dry-dock operations, the 4 ships departed again in perfect shape to meet the challenges of the 2007-2008 winter cruise season: the Costa Marina departed from Savona on a 26-day cruise to Mauritius. In fact, next winter the ship will offer a new and exclusive itinerary to the Indian Ocean, departing from the famous tropical island with calls to Madagascar, Comore, Kenya, Seychelles, Reunion. the Costa Victoria and the Costa Classica are being positioned in South America for cruises to discover beaches and local folklore all the way to the southern tip of the world, Tierra del Fuego, a legendary place described in numerous and fascinating tales and myths. the Costa Concordia will offer 10 and 11-day cruises to Egypt, Turkey, Greece and Cyprus so that guests can enjoy a mild climate even during the winter while searching for ancient treasures.

Maritime Reporter June 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Cruise Ship Trends

Silversea Cruises Plans New Flagship

Cruise operator Silversea Cruises has unveiled its new flagship, the Silver Muse, which will begin sailing the seas in April 2017.    Built by Italian shipbuilding company Fincantieri,

Silversea Cruises Orders Luxury Ship from Fincantieri

Shipbuilder Fincantieri has received an order to build a new luxury cruise ship for client Silversea Cruises due for delivery in April 2017.    At 40,700 grt and accommodating 596 guests,

Confidence Low in Shipping Idustry

Confidence levels in the global shipping market have fallen to a seven-year low as a glut of cargo ships, weak freight rates and excess liquidity continue to batter the industry,

LNG

CNOOC Acquires Asia's 1st LNG Powered Tug

China National Offshore Oil Corporation (CNOOC) has taken delivery of Asia’s first tugboat Hai Yang Shi You 525, designed to operate solely on liquefied natural gas as ship’s fuel.

Teekay LNG Partners Declares Distribution

Teekay GP LLC, the general partner of Teekay LNG Partners L.P. has declared a cash distribution of $0.70 per unit for the quarter ended June 30, 2015. The cash distribution is payable on August 14,

Technip Samsung JV Wins 2 FLNG Project Contracts

The Browse project covers the realization and installation of three FLNG units to develop the Brecknock, Calliance and Torosa fields in the Browse Basin, 425 kilometers North of Broome,

 
 
Maritime Careers / Shipboard Positions Maritime Security Navigation Offshore Oil Pipelines Pod Propulsion Port Authority Ship Repair Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1144 sec (9 req/sec)