Icebreakers Break into Action

Tuesday, December 18, 2007
With ice forming at a rate that suggests the first “normal” winter shipping season in several years, Coast Guard officials have icebreakers working in disparate locations this week, according to a report on www.sooeveningnews.com. For now, two Bay-Class tugs, Katmai Bay and Biscayne Bay are working the ice in largely unfamiliar waters at Thunder Bay, Ont. and at Serpent Harbor, Ont. located at the northern end of Georgian Bay. Biscayne Bay, based at St. Ignace, has been working at Duluth-Superior then nearby Thunder Bay while the Duluth-based tender-breaker USCGC Alder was off about her buoy tending duties. (Source: www.sooeveningnews.com)
Maritime Reporter July 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Navigation

Panama Canal Traffic Situation for August / September

It is advised that there will be average traffic delays in Panama Canal. The projected queue as of 24:00 hours on August 23 is 48 vessels. IMPORTANT: The

Maritime Reporter @ 75: The Daily Cartoon

Maritime Reporter & Engineering News was founded by John J. O'Malley (1905-1980) in 1939, and today ranks as the world's largest audited trade publication in the world serving the maritime industry,

Two-way Route in the Great Barrier Reef and Torres Strait

The IMO-adopted ship routeing measure to enhance the safety and efficiency of navigation and protect the region’s sensitive marine environment will come into

Fuels & Lubes

MARAD: Total Fuel Cycle Study for Natural Gas

The Maritime Administration (MARAD) released a study that evaluates total fuel cycle emissions for natural gas versus conventional marine fuels. Results showed

LNG Transport Barge Design Approved by ABS

Conrad Shipyard, L.L.C. engaged Bristol Harbor Group, Inc. (BHGI) to develop a 3,000 cubic meter Liquefied Natural Gas (LNG) transport barge utilizing a Bristol

LNG America Selects Topside Designer for LNG Bunker Barge

LNG America has selected Taylor-Wharton to commence the front-end engineering and design work for the cryogenic topside of the company’s 3,000 cubic meter Gemini

 
 
Maritime Contracts Maritime Security Maritime Standards Naval Architecture Navigation Port Authority Salvage Ship Electronics Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1103 sec (9 req/sec)