LNG Ship Repaired

Tuesday, February 19, 2008
The Catalunya Spirit left its location off the coast of Gloucester, Mass., under its own power Friday night, after the Captain of the Port of Boston lifted the detention order placed when the LNG tanker lost propulsion 35 miles east of Chatham, Mass., early last week.

The 933-foot tanker has been under positive control at the site of the future Neptune Offshore LNG facility off Eastern Point Light since Tuesday while technicians worked nearly around the clock to complete repairs.

At 8:40 p.m., Friday, the Captain of the Port of Boston, Coast Guard Capt. Gail Kulisch, reviewed and approved the final repair certification presented by Lloyd's Register, an internationally recognized classification society, and the ship's owner, Teekay Corporation, signaling approval for the LNG tanker to re-enter international service.

After several days of troubleshooting, repair specialists have determined that a malfunctioning boiler feed pump, which supplies water to the main propulsion boilers, was the cause of the Catalunya Spirit's loss of power and propulsion.

"We are completely satisfied that the Catalunya Spirit is ready to return to service," said Kulisch, Federal On Scene Coordinator of the Unified Command in charge of the response. "There has been a thorough review of every system on board the ship, and I'm very impressed with the vessel owner's unprecedented commitment to fixing the problem."

Coast Guard, state and owner-contracted assets joined forces Monday to respond to the call that the Catalunya Spirit had lost power and was slowly drifting toward George's Bank off the coast of Cape Cod. Tugs arrived on scene and gained control of the tanker well before it neared the shoals.

"Safety was always our primary concern during this response," said Kulisch. "The public, the vessel and her crew, and the cargo were never in any danger, and we took every precaution to ensure the situation remained under control."

The LNG supply for consumer use is adequate, eliminating the need for the Catalunya Spirit to immediately complete its transit to the Everett, Mass., Distrigas facility to offload its cargo, where it is was heading from Trinidad and Tobago when it lost power.

Maritime Reporter April 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Finance

China Shipbuilders may Merge to Stay Afloat

The China's four state-run shipping-related companies  are reportedly in the initial phases of combining units in order to beef up the national shipbuilding industry, says local media.

Seaspan Takes Delivery of New Containership

Seaspan Corporation (SSW) has accepted delivery of a 14000 TEU containership, the YM Wellhead.    The new containership, which was constructed at Hyundai Heavy Industries Co.

'Make in India’ - the Newbuzzword in Indian Shipping Sector

The Prime Minister Narendra Modi's  'Make in India’ initiative offers a plethora of opportunities in the maritime sector, particularly in shipbuilding, with the

LNG

Solving the LNG Propulsion Puzzle

The last piece of the LNG infrastructure puzzle, in the form of North America’s first LNG bunker barge, falls into place at Conrad’s Orange, Texas Shipyard. With

LNG Emergency, Incident Response Study

Safety around Liquefied Natural Gas (LNG) is a hot topic, now that LNG is more and more becoming the fuel of the future. The results of a recent LNG emergency

Sea Star Line, ACT Sign LNG Bunkering System Agreement

System will be the first of its kind in the US for maritime industry   Sea Star Line, LLC and Applied Cryo Technologies (ACT), in cooperation with Dragon Products,

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Maritime Standards Pod Propulsion Port Authority Salvage Ship Electronics Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1935 sec (5 req/sec)