LNG Ship Repaired

Tuesday, February 19, 2008
The Catalunya Spirit left its location off the coast of Gloucester, Mass., under its own power Friday night, after the Captain of the Port of Boston lifted the detention order placed when the LNG tanker lost propulsion 35 miles east of Chatham, Mass., early last week.

The 933-foot tanker has been under positive control at the site of the future Neptune Offshore LNG facility off Eastern Point Light since Tuesday while technicians worked nearly around the clock to complete repairs.

At 8:40 p.m., Friday, the Captain of the Port of Boston, Coast Guard Capt. Gail Kulisch, reviewed and approved the final repair certification presented by Lloyd's Register, an internationally recognized classification society, and the ship's owner, Teekay Corporation, signaling approval for the LNG tanker to re-enter international service.

After several days of troubleshooting, repair specialists have determined that a malfunctioning boiler feed pump, which supplies water to the main propulsion boilers, was the cause of the Catalunya Spirit's loss of power and propulsion.

"We are completely satisfied that the Catalunya Spirit is ready to return to service," said Kulisch, Federal On Scene Coordinator of the Unified Command in charge of the response. "There has been a thorough review of every system on board the ship, and I'm very impressed with the vessel owner's unprecedented commitment to fixing the problem."

Coast Guard, state and owner-contracted assets joined forces Monday to respond to the call that the Catalunya Spirit had lost power and was slowly drifting toward George's Bank off the coast of Cape Cod. Tugs arrived on scene and gained control of the tanker well before it neared the shoals.

"Safety was always our primary concern during this response," said Kulisch. "The public, the vessel and her crew, and the cargo were never in any danger, and we took every precaution to ensure the situation remained under control."

The LNG supply for consumer use is adequate, eliminating the need for the Catalunya Spirit to immediately complete its transit to the Everett, Mass., Distrigas facility to offload its cargo, where it is was heading from Trinidad and Tobago when it lost power.

Maritime Reporter May 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Finance

Superyacht Marina Planned at San Juan, Puerto Rico

Puerto Rico Ports Authority issues RFP for Marina District. The project envisions a superyacht marina and dry dock maintenance, repair and overhaul facility

Tanker Demand Picks-up in Canada

Canada’s role in the oil industry has changed dramatically in recent years driven by synthetic crude oil production in the oil sands of Alberta.   New plans for Energy East,

CNPC Eyes Myanmar for LNG Terminal

China's biggest oil and gas company China National Petroleum Corp.(CNPC ) has expressed interested in  a terminal in Kyaukphyu in Myanmar  to receive imported Liquefied natural gas (LNG).

LNG

Hoegh LNG Bags FSRU Deal in Chile

Oslo-based Höegh LNG said it has signed an Floating Storage and Regasification Unit (FSRU)contract with Chilean Octopus LNG for the Penco-Lirquén LNG import terminal to be located in Concepción Bay,

CNPC Eyes Myanmar for LNG Terminal

China's biggest oil and gas company China National Petroleum Corp.(CNPC ) has expressed interested in  a terminal in Kyaukphyu in Myanmar  to receive imported Liquefied natural gas (LNG).

Natural Gas Articulated Conduit System Patented

Elliott Bay Design Group (EBDG) announced that long-time partner Moran Towing Corporation has been granted US Patent 8,967,174 for "Articulated conduit systems

 
 
Maritime Standards Naval Architecture Navigation Offshore Oil Pod Propulsion Ship Electronics Ship Simulators Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1228 sec (8 req/sec)