LNG Ship Repaired

Tuesday, February 19, 2008
The Catalunya Spirit left its location off the coast of Gloucester, Mass., under its own power Friday night, after the Captain of the Port of Boston lifted the detention order placed when the LNG tanker lost propulsion 35 miles east of Chatham, Mass., early last week.

The 933-foot tanker has been under positive control at the site of the future Neptune Offshore LNG facility off Eastern Point Light since Tuesday while technicians worked nearly around the clock to complete repairs.

At 8:40 p.m., Friday, the Captain of the Port of Boston, Coast Guard Capt. Gail Kulisch, reviewed and approved the final repair certification presented by Lloyd's Register, an internationally recognized classification society, and the ship's owner, Teekay Corporation, signaling approval for the LNG tanker to re-enter international service.

After several days of troubleshooting, repair specialists have determined that a malfunctioning boiler feed pump, which supplies water to the main propulsion boilers, was the cause of the Catalunya Spirit's loss of power and propulsion.

"We are completely satisfied that the Catalunya Spirit is ready to return to service," said Kulisch, Federal On Scene Coordinator of the Unified Command in charge of the response. "There has been a thorough review of every system on board the ship, and I'm very impressed with the vessel owner's unprecedented commitment to fixing the problem."

Coast Guard, state and owner-contracted assets joined forces Monday to respond to the call that the Catalunya Spirit had lost power and was slowly drifting toward George's Bank off the coast of Cape Cod. Tugs arrived on scene and gained control of the tanker well before it neared the shoals.

"Safety was always our primary concern during this response," said Kulisch. "The public, the vessel and her crew, and the cargo were never in any danger, and we took every precaution to ensure the situation remained under control."

The LNG supply for consumer use is adequate, eliminating the need for the Catalunya Spirit to immediately complete its transit to the Everett, Mass., Distrigas facility to offload its cargo, where it is was heading from Trinidad and Tobago when it lost power.

Maritime Reporter October 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Finance

Time-out for Kwanza Drilling

Statoil has decided to cancel the Stena Carron rig contract after fulfilling the work commitments in the Statoil-operated blocks 38 and 39 in the Kwanza basin offshore Angola.

Oil Deal Between Iraqi Kurdistan & Baghdad Welcomed

The United States welcomes an agreement between Iraq's central government in Baghdad and its northern Kurdistan region over the management of oil exports, U.

Nigeria to Cut Petrol Subsidy by Half

Nigeria plans to cut subsidies on petroleum products by half next year after sharp falls in global crude prices, spurred the government to revise its 2015 budget downwards,

LNG

HHI to Build FSRU for Höegh LNG

A new Floating Storage and Regasification Unit (FSRU) will be built by the Korean shipbuilding Company Hyundai Heavy Industries (HHI). This FSRU will be the fifth

BG Group's Queensland Curtis LNG to Ship First Cargo

BG Group is set to ship the first cargo of liquefied natural gas from its flagship gas project Queensland Curtis LNG on Dec. 20, a source familiar with the matter told Reuters.

Europe Stockpiling Low Cost, Surplus LNG

Demand from top Asian buyers drops sharply; Asian, European gas price spreads converge. Europe set to becoming dumping ground for LNG. Europe is set to become

 
 
Maritime Careers / Shipboard Positions Maritime Security Maritime Standards Navigation Pipelines Pod Propulsion Port Authority Ship Repair Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1174 sec (9 req/sec)