Ship Scheduled to Depart James River Reserve Fleet

Wednesday, February 20, 2008
The Bayamon is scheduled to be towed from the James River Reserve Fleet on Wednesday, February 20, at approximately 8:30 a.m. It will be the 66th ship to depart the James River site since January of 2001. The Bayamon, a trailership built in 1970 by the Sun Shipbuilding Corporation of Chester, Pennsylvania, will be dismantled at the All Star Metals, LLC facility in Brownsville, Texas. All Star Metals purchased the vessel for $12,221. It is expected to pass under the James River Bridge approximately two hours after the departure. However, be advised that such times vary widely depending on weather and other conditions.
Maritime Reporter September 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Navy

Navy to Commission Submarine North Dakota

The Navy will commission its newest attack submarine North Dakota, during a ceremony Saturday, Oct. 25, 2014, at Submarine Base New London in Groton, Connecticut.

US Navy CNO: Photo of the Day

Chief of Naval Operations (CNO) Adm. Jonathan Greenert receives a system update brief in the combat information center aboard the Arleigh Burke-class guided-missile

U.S. Navy Contracts 12 Rapid Response Skimmers

Kvichak Marine won a US Navy contract for 12 30-ft.Rapid Response Skimmers (RRS) for delivery over the next 18 months, with options for up to 30 additional skimmers to be delivered through 2019.

 
 
Maritime Contracts Maritime Security Naval Architecture Navigation Offshore Oil Pod Propulsion Port Authority Ship Repair Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1460 sec (7 req/sec)