Odfjell Announces Ship Sale and Delivery

Wednesday, March 19, 2008

As part of Odfjell's continued fleet renewal process, two older ships have been sold. The company also took delivery of the 33,707 fully stainless steel newbuilding M/T Bow Heron on long term time-charter.
The parcel tanker M/T Bow Condor (27,950 dwt/built 1978) has been sold for demolition. The Bow Condor was built in and was the last vessel of the 13 ships in the B76 series to operate in our service.

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter July 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Vessels

Ithaca’s FPF-1 platform to be moved to Stella field

Ithaca Energy Inc. reports that the "FPF-1" floating production facility has completed the required inclination test as planned and departed the Remontowa shipyard in Gdansk, Poland.

Live Fish Carrier Launched at Gondan

At high tide, the vessel “MARTIN SÆLE”, the first Live Fish Carrier built by Gondan Shipyard in Figueras, was successfully launched today. Representatives of the owner of the vessel,

GTT Cuts Outlook on Ship Construction Delays

French supplier of systems for marine transportation of liquified natural gas (LNG) Gaztransport & Technigaz (GTT) reported strong growth in its first half results

 
 
Maritime Contracts Maritime Standards Navigation Offshore Oil Pipelines Pod Propulsion Port Authority Salvage Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0682 sec (15 req/sec)