ACP Awards Contract for Construction of New Dredge

Wednesday, March 26, 2008

Moving forward with its equipment upgrades for the Expansion Program, the Panama Canal Authority (ACP) officially awarded the contract to design and build a new, more powerful cutter suction dredge to IHC Beaver Dredgers B.V. on March 14, 2008. The new 12,000KW dredge will replace "Mindi," which has been in service at the Canal since 1942 and has only a 9,000KW capacity. With an expected delivery date of May 2011, the new dredge will have the modern equipment, systems and components required for efficient operation. "IHC Beaver Dredgers B.V. is very well-respected in the industry and has the expertise to meet our needs. The construction of a dredge with more pumping capacity and the ability to dredge deeper will allow us to continue to make the waterway even more navigable, safe, reliant and efficient," said ACP Vice President of Operations Manuel Benitez. "With this new dredge, the ACP will boost the production capacity of our dredging fleet. This increase is necessary to meet the demands of the expansion, as well as the maintenance and modernization projects of the waterway." The new dredge will be constructed in The Netherlands and will have the capacity to dredge along the entire Canal including the Gaillard Cut (the narrowest stretch in the Panama Canal), Gatun Lake, and both Atlantic and Pacific entrances, at a depth of 25 meters, even after the expansion concludes.
The selection process for the construction of the new dredge began in September 2007, when the ACP released its request for proposals. The ACP awarded the $95.920 million contract to bidder IHC Beaver Dredgers B.V. after reviewing its proposal to ensure that all requirements were met. Dredge construction will begin within the coming months.

Maritime Reporter May 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

Bids Placed for Novy Port Icebreaker Contract

Seven companies submit bids for contract for Yamal Novy Port terminal icebreaker   The tendering process for the Yamal Novy Port terminal icebreaker design and build contract has kicked off,

Alewijnse Success at Damen Shiprepair Dunkerque

Electrical system integrator Alewijnse Marine Systems is celebrating the first anniversary of delivering electrical services and maintenance to vessels at Damen Shiprepair Dunkerque.

GE Gas Turbine to Power USCG Cutter

GE LM2500 gas turbine to power United States Coast Guard‘s eighth National Security Cutter   GE Marine reports that its LM2500 gas turbine will power the United

Dredging

Savannah Harbor Expansion Project Update

Lt. Gen. Thomas Bostick, commander of the U.S. Army Corps of Engineers, visited the Port of Savannah on Thursday, for an update on the Savannah Harbor Expansion Project (SHEP).

Dredge Yard, Neptune Shipyards Introduce New Dredger

Dredge Yard announced it has partnered with Netherlands-based Neptune Shipyards to develop the new cutter suction dredger, EURO DREDGER 450. Iulia Berchiu, Dredge Yard’s Marketing Manager,

Snarled in Traffic, Intermodal Answers Include the Water

It was just last month that the (challenged) Keefe family packed up the SUV and set out for a little bit of spring break fun, mixed in with a college visit for my son,

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Standards Navigation Pod Propulsion Port Authority Salvage Ship Electronics Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1046 sec (10 req/sec)