ACP Awards Contract for Construction of New Dredge

Wednesday, March 26, 2008

Moving forward with its equipment upgrades for the Expansion Program, the Panama Canal Authority (ACP) officially awarded the contract to design and build a new, more powerful cutter suction dredge to IHC Beaver Dredgers B.V. on March 14, 2008. The new 12,000KW dredge will replace "Mindi," which has been in service at the Canal since 1942 and has only a 9,000KW capacity. With an expected delivery date of May 2011, the new dredge will have the modern equipment, systems and components required for efficient operation. "IHC Beaver Dredgers B.V. is very well-respected in the industry and has the expertise to meet our needs. The construction of a dredge with more pumping capacity and the ability to dredge deeper will allow us to continue to make the waterway even more navigable, safe, reliant and efficient," said ACP Vice President of Operations Manuel Benitez. "With this new dredge, the ACP will boost the production capacity of our dredging fleet. This increase is necessary to meet the demands of the expansion, as well as the maintenance and modernization projects of the waterway." The new dredge will be constructed in The Netherlands and will have the capacity to dredge along the entire Canal including the Gaillard Cut (the narrowest stretch in the Panama Canal), Gatun Lake, and both Atlantic and Pacific entrances, at a depth of 25 meters, even after the expansion concludes.
The selection process for the construction of the new dredge began in September 2007, when the ACP released its request for proposals. The ACP awarded the $95.920 million contract to bidder IHC Beaver Dredgers B.V. after reviewing its proposal to ensure that all requirements were met. Dredge construction will begin within the coming months.

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter February 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

Sea IT, Veritas Tankers Ink Long-term Software Deal

Sea IT has entered a long term ICT agreement with Veritas Tankers. The agreement comprises installation of BlueCORE Generation 4, an ICT platform specifically developed for the marine industry,

Interior Facelift for Queen Mary 2

Cunard’s luxurious flagship, the iconic 2,620 passenger ocean liner Queen Mary 2, will undergo an interior refit at the hands of McCue Marine during a 25-day multimillion-pound

Chemical Shipping Freight Rates to Remain Under Pressure

On the back of low bunker prices and more new buildings to be delivered in 2016, chemical shipping freight rates for both contracts of affreightment and spot cargoes

Dredging

Yacht Club Takes Delivery of New Dredger

Rose City Yacht Club, a long-standing private marina and social club along the Columbia River in Portland, Ore., recently took delivery and startup of a new 8-inch Badger Class dredge from Reserve,

Sydney Deep Water Port Project Named NOVAPORTE

The Harbor Port Development Partners (HPDP) and the Port of Sydney announce the new brand for Sydney’s new container terminal: NOVAPORTE and its adjacent logistics park NOVAZONE.

Funding Secured for Project to Deepen the Delaware River

Dennis Rochford, president of the Maritime Exchange for the Delaware River and Bay, announced that President Obama’s FY17 proposed budget includes $33 million for the Delaware River Deepening Project.

 
 
Maritime Security Maritime Standards Naval Architecture Navigation Salvage Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0679 sec (15 req/sec)