STX Begins Construction of Tankers

Tuesday, April 15, 2008

Port News reported that the steel cutting for the new ship of PRISCO was held at STX Shipyard in South Korea. The new vessel is the first of seven tankers of 51,000 tonnes deadweight each, according to a report on http://steelguru.com.
The main ship of this series is scheduled to put into operation on November, 2008. The other vessels are planed to be delivered by May 2009.

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter June 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

Fundraiser Held for USS Gerald R. Ford Crew

Blackmer, a company in positive displacement and centrifugal pump and reciprocating compressor technologies, has a relationship with the U.S. Military that dates

Meercat Workboats Scores a Hat-trick

The U.K.’s Meercat Workboats says it scored a hat-trick; the Hampshire-based boat builder announced it is moving premises, that Seawork was a huge success and that

First MAN D2676 Workboat Engine Ready for Launch

Last December, MAN Engines introduced its latest generation in-line six-cylinder engines for workboats. Now the first MAN D2676 LE443 engine off the production

 
 
Maritime Standards Naval Architecture Navigation Offshore Oil Pod Propulsion Salvage Ship Electronics Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0614 sec (16 req/sec)