A&P Tyne Awarded Conversion Contract

Wednesday, April 16, 2008

A&P Tyne was awarded a contract to carry out the conversion of a former ice breaking cargo vessel into a DP3 Flotel, accommodation vessel carrying up to 399 persons.
The contract has been awarded by the C&M Group of on behalf of the owners Silters, to A&P Tyne Ltd. Some preparations have already taken place on the vessel in the . The vessel is due to be brought to the by the heavy lift cargo vessel Fairstar Fjord where the main part of the conversion will be undertaken.
This is a challenging project and typical of the complex marine conversions carried out by A&P Tyne over recent years.
The project will require the fitting of some 1400 tons of new accommodation block steel work, accommodation for 399 people which include all the necessary services to support the personnel to be carried.
There will be a further 1900 tons of steel work fabricated and fitted to form new decks and machinery spaces. 8 new generating sets will be fitted to power 8 new thrusters giving the vessel full DP3 dynamic positioning capability.
An interesting design feature is the fact that the vessel will be the first of her type to be fully Ice Classed and will be capable of operating in conditions of minus 40 deg Celsius.
The vessel (ex “Paardeberg”) has been renamed Ice Maiden 1.
The contract will take 9 months to execute from the time of arrival at the yard and is worth in excess of $59.2m.

Maritime Reporter March 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

Vigor’s Tacoma Yard Delivers Breasting Barges to Foss

Vigor Industrial expands its newbuild capacity in Washington; Tacoma yard delivers three breasting barges   Fabrication teams at Vigor Industrial’s Tacoma, Wash.

Hands Across the Water

U.S. firms leverage Netherlands-based Damen Shipyard’s vessel designs and technical support. For nearly 40 years, Damen Shipyards Group in the Netherlands has

Icebreakers Ordered for Neft’s Novy Port Project

Aker Arctic’s icebreaker design selected for Gazprom Neft’s Novy Port project   Aker Arctic and Vyborg Shipyard have confirmed a contract for the design of two

 
 
Maritime Careers / Shipboard Positions Naval Architecture Navigation Offshore Oil Pipelines Pod Propulsion Salvage Ship Electronics Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0860 sec (12 req/sec)