MARAD – Port Dolphin Energy LNG DWP

Thursday, April 17, 2008

The Maritime Administration (MARAD) issued a notice stating that it and the US Coast Guard are making available the Draft Environmental Impact Statement (DEIS) for the Port Dolphin Energy liquefied natural gas (LNG) deepwater port (DWP) project.  Plans call for construction and operation of the import facility in waters of the Gulf of Mexico approximately 28 miles off the coast of Florida.  A public meeting will be held in Palmetto, Florida on May 6.  Written comments should be submitted by June 2.  73 Fed. Reg. 21012  (HK Law).

Maritime Reporter July 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

LNG

Policy Uncertainty Threatens to Slow Renewable Energy Momentum

IEA forecast sees renewable power as a cost-competitive option in an increasing number of cases, but facing growing risks to deployment over the medium term. The

SHIPPINGInsight Extends Early-bird Registration

SHIPPINGInsight 2014 is extending the deadline for early-bird registration to Sept. 15. Attendees registering online at www.shippinginsight.com/choose-event prior to midnight Sept.

LNG Finalizes Acquisition of Bear Head LNG Project

Liquefied Natural Gas Limited today informed having finalised the acquisition of 100% of Bear Head LNG Corporation (BHLC). This follows the announcement

 
 
Maritime Careers / Shipboard Positions Maritime Security Maritime Standards Navigation Pod Propulsion Port Authority Salvage Ship Repair Ship Simulators Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0859 sec (12 req/sec)