IMO Reoccupying its Headquarters

Wednesday, April 23, 2008


IMO will be fully operational, once again, from its Headquarters on 's Albert Embankment, following a 20-month period in temporary accommodation while the Headquarters building underwent major refurbishment.
The first major meeting to be held in the refurbished Headquarters will be the 84th session of the Maritime Safety Committee (7 to 16 May) and the building will be formally re-opened in a special ceremony in mid-June to coincide with the 100th session of the IMO Council.
Although the IMO building is largely unchanged externally, internally the changes are dramatic. IMO staff and delegates to the Organization's meeting now have a building that reflects the very latest technological, IT and communication facilities of the 21st century and which also incorporates state-of-the-art safety, security and occupational health features. Enhanced meeting, office and catering facilities for both delegates and staff have created a modern workspace to meet the Organization's current and future needs.
Against a background in which environmental concerns have moved to centre-stage, not only on the list of global concerns but also in IMO's own work program, the Headquarters building has had its own environmental performance enhanced. The majority of the original mechanical and electrical main plant and systems have been replaced with modern, high-efficiency equipment to reduce energy consumption, improve efficiency and to protect IMO's business continuity with improvements in reliability.
A new building management system allows central control and monitoring of all the mechanical and electrical plant and systems, thus improving performance monitoring and identification of defects.

Additional insulation has been installed in roof areas to reduce heat loss through the building fabric and an energy-efficient lighting control system has been fitted. High-efficiency fittings and controls have been installed and detectors fitted such that, when rooms are unoccupied for a period of time, lighting will automatically switch off.
It was in 2005 that the IMO Council first agreed to the 's proposal - as host Government - for a major refurbishment of the Headquarters building. The original intention had been for a two-phase project but, in the event, the entire refurbishment has been completed in a single phase, thereby considerably reducing disruption and consequential costs.

IMO's full postal and visiting address reverts to:

4 Albert Embankment
SE1 7SR

All current telephone and fax numbers and e-mail addresses remain unchanged and post sent to the temporary address will be re-directed.

Maritime Reporter May 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

News

Maersk Line Gets New Head in China

Maersk Line on May 21 announced that Mike Fang become the company's new chief of east - and central China. He joins with effect from 1 July 2015.    Fang has

HSH Nordbank Looking to Split Off Bad Shipping Loans

HSH Nordbank AG, the world’s second-largest financier of ships, plans to split off a "bad bank" for non-performing shipping loans as part of a plan to create a sustainable business model,

Navios in Red, but Beats Estimates

Navios Maritime Holdings, vertically integrated seaborne shipping and Logistics Company, slumped to a loss in the Q1 although the result beat by $0.10 per share

 
 
Maritime Standards Navigation Offshore Oil Pipelines Pod Propulsion Salvage Ship Repair Ship Simulators Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1468 sec (7 req/sec)