Aker Solutions Removes EPC-LNG From Backlog

Thursday, April 24, 2008

The $665m  EPC-LNG contract was awarded to the joint venture (50/50) between Aker Solutions (formerly Aker Kvaerner) and IHI, Inc. (formerly Ishikawajima-Harima Heavy Industries) and announced in a stock exchange release 19 July 2006, pending the issue of a Full Notice to Proceed from Ingleside Energy Corporation. Not having received such a Notice to Proceed effects Aker Solutions' backlog by USD 330 million. As a result, Aker Solutions has decided to remove the contract from its order backlog with effect from first quarter 2008.

Maritime Reporter June 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

New AVEVA ISM Bridges the Gap

AVEVA launches a new application for governing asset information using a standards-based methodology. AVEVA announced the launch of AVEVA Information Standards Manager (AVEVA ISM),

General Dynamics gets $25 mi GPS Contract from Lockheed Martin

General Dynamics Advanced Information Systems, a business unit of General Dynamics, was awarded a $25.4 million full-production contract from Lockheed Martin to support the U.

Globecomm to Provide VSAT for PBJV Barge

Purpose-built accommodation and pipe-lay barge on charter to Petronas equipped with VSAT and L-Band services. Globecomm Maritime has been awarded a contract

 
 
Maritime Contracts Maritime Standards Naval Architecture Offshore Oil Pod Propulsion Port Authority Salvage Ship Electronics Ship Simulators Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1103 sec (9 req/sec)