Makin Island Sailors Prepare to Defend their Ship

Thursday, May 01, 2008

By Mass Communication Specialist 2nd Class Justin Webb, Commander, Naval Surface Force Public Affairs

Thirty-five Sailors from Pre-Commissioning Unit (PCU) (LHD 8) graduated the Damage Control Familiarization Safety, Environmental and Occupational Health Programs (DC CREWFAM) at Northrop Grumman Shipbuilding (NGSB) West Administrative Annex, April 11.
DC CREWFAM is designed to provide Makin Island crew members with basic damage control (DC) processes, familiarization with the DC systems aboard the ship, and to review fundamentals covered in the personnel qualification standards (PQS) for those aboard.
Machinery Repairman 1st Class (SW/AW) Calandra Crawford, who is also a DC academy instructor, attended the course and feels very strongly about damage control and its purpose on .
All Makin Island Sailors are required to complete the Basic DC PQS within six months of reporting to the command. Chief Warrant Officer Rob Morrow, 's damage control division officer, said the goal aboard is for proficiency and working knowledge, not just PQS completion.
NGSB personnel will continue to hold approximately 260 CREWFAM courses for crew members both at PCU in and the Pre-Commissioning Detachment in , until three weeks prior to 's departure from Northrop Grumman Shipbuilding.
Following delivery of the ship to the Navy, crew members will sail the ship from to where the ship will be commissioned.
Sailors, who are in their nine to 12-month negotiating window for orders and want to be part of the Pre-Commissioning Command, can contact their rating detailer and ask to be released to the Pre-Commissioning detailer for further assignment to . Makin currently has almost half of her 1,100-person crew.

Maritime Today

The Maritime Industry's original and most viewed E-News Service

Maritime Reporter November 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds


Maersk to Idle Vessel

The world's biggest container-ship operator Maersk Line  has confirmed market talk that it has temporarily idled one of its largest vessels - yet another sign that the industry is in dire straits,

Russian Navy Trying Hard for Facelift

Official announcements related to naval shipbuilding give the appearance of a Russian Navy that is undergoing a rapid revival. However, the reality is that many

USNS Maury Completes Acceptance Trials

USNS Maury (T-AGS 66) completed Acceptance Trials, November 6, following a week of extensive ship tests and underway events, included testing of major propulsion,

Maritime Contracts Maritime Security Naval Architecture Offshore Oil Port Authority Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1818 sec (6 req/sec)