USACE Issues DEIS for Container Terminal Project

Monday, May 12, 2008

The US Army Corps of Engineers (USACE) issued a notice stating that it is recirculating the Draft Environmental Impact Statement (DEIS) for the Berths 97-109 [China Shipping] Container Terminal Project in the Port of Los Angeles. Comments should be submitted by June 30.

Source: HK Law

Maritime Reporter March 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

News

Crewman Claims Ferry Captain "Rushed Back To Bridge"

The captain of a South Korean ferry that capsized two days ago rushed back to the bridge after it started listing severely and tried in vain to right the vessel,

Canaveral Tops State List for Sand Bypass Funding

The Canaveral Harbor Inlet Sand Bypass Project has earned the top state ranking for 2014/15 inlet management funding. As a result, Port Canaveral is expected to receive $100,

Rotterdam port's throughput almost stable

The Port of Rotterdam’s throughput in the first quarter of 2014, at 109 million tonnes, was 0.2% below the level for the corresponding period last year.Split up by goods type,

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Maritime Standards Offshore Oil Pod Propulsion Ship Electronics Ship Repair Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1040 sec (10 req/sec)