FERC – Weaver’s Cover Offshore Berth Project

Wednesday, June 11, 2008

The Federal Energy Regulatory Commission (FERC) issued a notice stating that it is evaluating the Offshore Berth Project planned by Weaver’s Cove Energy. The plan calls for construction of a berthing facility in Mount Hope Bay, approximately one-mile southwest of Brayton Point in Somerset, Massachusetts, with pipelines connecting the berthing facility with the previously authorized liquid natural gas (LNG) facility in Fall River. Public scoping meetings will be held in , (June 24) and (June 25). Written comments should be submitted by July 7.

source: HK Law

Maritime Reporter September 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

News

PDVSA Charters Another Algerian Crude Cargo

Venezuela's state-run oil company PDVSA has hired a supertanker to load a second 2 million-barrel cargo of Algerian crude, according to preliminary tanker fixture data.

Video: USCG Medevacs Navy Sailor off Virginia

The U.S. Coast Guard (USCG) medevaced a man Wednesday from a Navy vessel off the Virginia coast after watchstanders at Coast Guard Sector Hampton Roads in Portsmouth

VT Halter Begins Building LNG-powered ConRo Ships for Crowley

VT Halter Marine, Inc., a subsidiary of Vision Technologies Systems, Inc. (VT Systems), has commenced construction on the first of two liquefied natural gas (LNG)-powered,

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Maritime Standards Navigation Ship Electronics Ship Repair Ship Simulators Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1107 sec (9 req/sec)