FERC – Weaver’s Cover Offshore Berth Project

Wednesday, June 11, 2008

The Federal Energy Regulatory Commission (FERC) issued a notice stating that it is evaluating the Offshore Berth Project planned by Weaver’s Cove Energy. The plan calls for construction of a berthing facility in Mount Hope Bay, approximately one-mile southwest of Brayton Point in Somerset, Massachusetts, with pipelines connecting the berthing facility with the previously authorized liquid natural gas (LNG) facility in Fall River. Public scoping meetings will be held in , (June 24) and (June 25). Written comments should be submitted by July 7.

source: HK Law

Maritime Reporter April 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

News

Goliat FPSO in Norway

The Goliat FPSO was successfully floated off the heavy-lift vessel, Dockwise Vanguard, in the fjord outside Hammerfest, says Eni Norge    The Goliat platform has arrived in Hammerfest,

BIMCO Welcomes EU Decision on Migrants

BIMCO has stated today that it appreciates the new efforts by EU leaders to reduce increasing reliance on merchant shipping to rescue the growing numbers of

Long Beach, Los Angeles ports host forum to gather input

More than 100 cargo owners, trucking firm leaders, longshore labor, marine terminals and other goods movement industry representatives turned out Wednesday for

 
 
Maritime Contracts Maritime Standards Naval Architecture Navigation Offshore Oil Pipelines Salvage Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1575 sec (6 req/sec)