Donjon Removes Rail Bridge Span

Monday, July 07, 2008

Putting its heavy-lift capability to the test, on June 24, 2008, Donjon Marine Co., Inc. removed an old, rusted, 1,000-ton Amtrak rail bridge span located across the Thames River in New London, Connecticut.   Donjon’s Chesapeake 1000, the largest floating heavy-lift crane on the East Coast, hoisted the bridge span -- in place at that location for 89 years -- from the track and transported it onboard one of its new 1400-class deck barges (Witte 1402) back to Port Newark for dismantling and disposal. The old bridge span will be replaced with a new, 1,888-foot-long, 35-feet-wide section. 

 www.donjon.com. 

Maritime Reporter August 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

 
 
Maritime Careers / Shipboard Positions Maritime Standards Naval Architecture Navigation Offshore Oil Port Authority Ship Repair Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0913 sec (11 req/sec)