Donjon Removes Rail Bridge Span

Monday, July 07, 2008

Putting its heavy-lift capability to the test, on June 24, 2008, Donjon Marine Co., Inc. removed an old, rusted, 1,000-ton Amtrak rail bridge span located across the Thames River in New London, Connecticut.   Donjon’s Chesapeake 1000, the largest floating heavy-lift crane on the East Coast, hoisted the bridge span -- in place at that location for 89 years -- from the track and transported it onboard one of its new 1400-class deck barges (Witte 1402) back to Port Newark for dismantling and disposal. The old bridge span will be replaced with a new, 1,888-foot-long, 35-feet-wide section. 

 www.donjon.com. 

Maritime Reporter February 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Salvage

Lysblink Seaways to Be Towed to Shelter

Cargo ship Lysblink Seaways, which ran aground on Scotland’s west coast February 18, will be transported to shelter this afternoon after a successful ship-to-ship

Fuel to Be Pumped from Grounded Cargo Ship

The ship to ship transfer of the fuel oil from the grounded cargo ship Lysblink Seaways is scheduled to begin tomorrow morning as better weather conditions provide a work window between 3 a.

70 Dead in Bangladesh Ferry Collision

At least 70 people died when a ferry carrying 150 passengers and crew capsized after colliding with a trawler on a river in central Bangladesh, police said on Monday.

 
 
Maritime Careers / Shipboard Positions Maritime Standards Naval Architecture Offshore Oil Salvage Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.4022 sec (2 req/sec)