Donjon Removes Rail Bridge Span

Monday, July 07, 2008

Putting its heavy-lift capability to the test, on June 24, 2008, Donjon Marine Co., Inc. removed an old, rusted, 1,000-ton Amtrak rail bridge span located across the Thames River in New London, Connecticut.   Donjon’s Chesapeake 1000, the largest floating heavy-lift crane on the East Coast, hoisted the bridge span -- in place at that location for 89 years -- from the track and transported it onboard one of its new 1400-class deck barges (Witte 1402) back to Port Newark for dismantling and disposal. The old bridge span will be replaced with a new, 1,888-foot-long, 35-feet-wide section. 

 www.donjon.com. 

Maritime Reporter June 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Salvage

Concordia Tow Update: Smooth Sailing

The Costa Concordia wreck removal team reported this morning at 10:30 a.m. that after 22 hours of navigation, the convoy was over 50 miles off Giglio Island with about 140 miles from Genoa Prà-Voltri.

Legislation Grants Funding for EU's EMSA

EU Council Adopts Regulation on EMSA Funding The European Union Council adopted a regulation yesterday to finance the actions of the European Maritime Safety

Concordia Expected to Reach Genoa Saturday

The Crowley Maritime Corp. subsidiary TITAN Salvage and partner Micoperi have confirmed that the Costa Concordia – the Concordia class cruise ship that wrecked along shores of Giglio Island,

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Naval Architecture Navigation Offshore Oil Pipelines Port Authority Ship Electronics Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1249 sec (8 req/sec)