Donjon Removes Rail Bridge Span

Monday, July 07, 2008

Putting its heavy-lift capability to the test, on June 24, 2008, Donjon Marine Co., Inc. removed an old, rusted, 1,000-ton Amtrak rail bridge span located across the Thames River in New London, Connecticut.   Donjon’s Chesapeake 1000, the largest floating heavy-lift crane on the East Coast, hoisted the bridge span -- in place at that location for 89 years -- from the track and transported it onboard one of its new 1400-class deck barges (Witte 1402) back to Port Newark for dismantling and disposal. The old bridge span will be replaced with a new, 1,888-foot-long, 35-feet-wide section. 

 www.donjon.com. 

Maritime Reporter July 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Salvage

Signet Tows Aircraft Carrier on Final Voyage

The final voyage of aircraft carrier USS Saratoga begins today. From the Eastern Hemisphere to the Western Hemisphere, the USS Saratoga has made her mark around the globe,

Ohio River Reopens as Oil Spill Clean-up Progresses

A 15-mile section of the Ohio River was reopened for limited traffic on Wednesday as clean-up of a 5,000-gallon fuel oil spill continued, the U.S. Coast Guard said on Wednesday.

Search Suspended for Man Overboard near Cedar Bayou

The U.S. Coast Guard suspended its search Tuesday for a man who went missing after his shrimp boat overturned Monday near Cedar Bayou on the Houston Ship Channel.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Navigation Offshore Oil Pipelines Ship Simulators Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0964 sec (10 req/sec)