Donjon Removes Rail Bridge Span

Monday, July 07, 2008

Putting its heavy-lift capability to the test, on June 24, 2008, Donjon Marine Co., Inc. removed an old, rusted, 1,000-ton Amtrak rail bridge span located across the Thames River in New London, Connecticut.   Donjon’s Chesapeake 1000, the largest floating heavy-lift crane on the East Coast, hoisted the bridge span -- in place at that location for 89 years -- from the track and transported it onboard one of its new 1400-class deck barges (Witte 1402) back to Port Newark for dismantling and disposal. The old bridge span will be replaced with a new, 1,888-foot-long, 35-feet-wide section. 

 www.donjon.com. 

Maritime Reporter March 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Salvage

Stranded Virginia Beach Bulker Salvage Plan Set

The Coast Guard advises it is in the final stages of reviewing a salvage plan that is scheduled to begin Friday morning to move the 751-foot bulk carrier, 'Ornak',

Obama Offers US Aid to S.Korea Following Ferry Accident

U.S. President Barack Obama on Thursday expressed condolences to the families of the victims of the South Korean ferry sinking and said the U.S. military will provide

USCG Responds to Vessel Fire

The U.S. Coast Guard (USCG) reported it is responding to a report of a vessel that caught fire and became disabled with two men and a dog aboard south of the McCormick

 
 
Maritime Careers / Shipboard Positions Maritime Security Maritime Standards Naval Architecture Navigation Pod Propulsion Port Authority Salvage Ship Electronics Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0808 sec (12 req/sec)