Schat-Harding Launches New Offshore Lifeboat

Monday, August 25, 2008

Schat-Harding is to launch a new generation freefall lifeboat for the offshore industry at the Offshore North Sea exhibition. The FF1200 boat
and matching davit will have a capacity for up to 70 persons and will be suitable for drop heights from platforms and other offshore units up to
33 m above sea level in extreme conditions. The unique feature of the new design is that it meets all the new OLF (The Norwegian Oil Industry
Association) design criteria for lifeboats in the Norwegian offshore sector, which leads the world in offshore safety standards.
The FF1200 has additional clearance inside the boat for safety and comfort with a more streamlined shape and powerful engine to give better headway in waves. Improved structural design will maximize canopy strength during the drop and splash in and a new seat design is based on heavier workers, with an average weight of 100 kg. Five point seatbelts will keep passengers from 1.4 m to 2.1 m tall safe and comfortable even with high drop heights into heavy waves.
New research has shown that some passengers in high-drop freefall boats can be exposed to very high g forces, especially when the boat is
launched into heavy seas. Schat-Harding, working with the OLF, has introduced a new seat, seat belt and head protection arrangement which are designed to ensure that all personnel in the lifeboat are protected from high g forces when launched even into the troughs of large waves.
The new seats and head restraints have been tested at the TNO Automotive test centre in Eindhoven, The Netherlands. The tests are based on a
worst case scenario with waves up to 15 m significant height. Seats and restraints based on the principles proven in the test will be fitted to
the new FF1200 and also be available for retrofit to the FF1000 and FF48 freefall boats in service.
A full size prototype will be tested at the end of 2008. Orders for the new boats have already been received from BP Norge for the Skarv FPSO
and Valhall RD, and Talisman Energy for the Yme RD. The first delivery is due March 2009.
Email: per.einar.gjerding@schat-harding.com

Maritime Reporter July 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Offshore

Lamprell First Half Results Beat Expectations

Lamprell today announced its financial results for the first half of 2014, reporting results ahead of expectations due to strong operational performance and early results from savings initiatives,

Kongsberg to Supply FPSO Safety System

Kongsberg Maritime Engineering (KME), the wholly owned Engineering, Procurement and Construction (EPC) subsidiary of global maritime technology developer Kongsberg Maritime,

CWind Wins 3-year O&M Services Contract

CWind, a provider of services to the offshore wind industry, have signed a three-year contract to provide crew and equipment transfer for DONG Energy and Scottish

Maritime Safety

Helideck Safety System to Launch at SMM

Amarcon and Observator Instruments will develop a helideck monitoring and forecasting system to improve the safety of helicopter landings and take-offs from a vessel.

Coast Guard Responds to Capsized Tug in Chicago

The Coast Guard is responding to the capsizing of a tug on the Calumet River near the 106th St. Bridge in Chicago in which two crew members were able to escape and swim to shore.

Crippled Pine Galaxy Arrives in San Francisco

The disabled mixed-products tanker Pine Galaxy arrived in San Francisco for repairs Wednesday. Commercial tugs towed the ship safety into the Port of San Francisco

 
 
Maritime Contracts Maritime Security Maritime Standards Naval Architecture Navigation Offshore Oil Pipelines Port Authority Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1704 sec (6 req/sec)