Navy Accepts Delivery of Future USS Freedom

Friday, September 19, 2008
Littoral combat ship USS Freedom (LCS 1) returns to its homeport in Marinette, Wis., after completing acceptance trials in Lake Michigan. A littoral combat ship is a fast, agile, focused-mission ship designed to defeat threats such as mines, quiet diesel submarines and fast surface craft. Freedom is scheduled to be delivered later this year and will be homeported in San Diego, Calif. U.S. Navy photo by Mass Communication Specialist 3rd Class Jhi L. Scott

Cmdr. Walt Coppeans, Supervisor of Shipbuilding Gulf Coast, officially accepted delivery of Freedom (LCS 1) on behalf of the Navy from the Lockheed Martin/Marinette
Marine/Gibbs and Cox team in Marinette, Wis., Sept. 18.  Since Builder's and Acceptance Trials this summer, the Navy and the Lockheed Martin team have been working to prepare the ship for delivery, sail away and commissioning.  With acceptance by the Navy, the LCS crew will move aboard and prepare the ship to depart Marinette Marine for
Milwaukee, the location of the ship's Nov. 8 commissioning.  Upon commissioning, the ship will sail out of the Great Lakes and down the East Coast for Norfolk, Va., making a number of port calls along the way.
Prior to delivery, the Navy's Board of Inspection and Survey (INSURV) conducted Acceptance Trials aboard LCS 1 Aug. 17-21.  INSURV found the ship to be "capable, well-built and inspection-ready" and recommended that the Chief of Naval Operations authorize delivery of the ship.
Because the trials were conducted in Lake Michigan, some ship systems, including aviation and combat systems, could not be demonstrated.
Systems not demonstrated during recent trials will be presented to INSURV in early 2009 trials in Norfolk, Va., and in the open ocean.

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter July 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Navy

Hyundai Bags NZ Defence Order

Hyundai Heavy Industries (HHI), the world’s largest shipbuilder, has won an order to build a 23,000 ton class logistics support vessel for New Zealand Defence

N.Korea Builds New Submarine Base

North Korea is in the midst of building a new naval base on the east coast to accommodate submarines capable of firing submarine-launched ballistic missiles (SLBMs), says IHS Jane's Defence Weekly.

NASSCO Bags USS Oak Hill Modification Award

General Dynamics NASSCO-Norfolk was awarded a $42 million cost-plus-award-fee modification to a previously awarded contract for the repair and alteration for the USS Oak Hill (LSD-51).

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Standards Navigation Salvage Ship Electronics Ship Simulators Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0704 sec (14 req/sec)