Newbuildings Earmarked for Rickmers-Linie

Thursday, September 25, 2008

Four more 24,000dwt multi-purpose vessels have been ordered for the global services of Rickmers-Linie, the heavylift and project cargo shipping company by Polaris Shipmanagement, a Rickmers Group company. The contract with the Chinese shipbuilder Guangzhou Wenchong was signed in on the evening of 23 September, the first day of the major German shipbuilding and marine equipment exhibition, SMM.

Delivery of the first vessel is scheduled for May 2011 and by December 2011 all four will be in service. This latest quartet brings to 18 the number of newbuildings now contracted in for ultimate deployment in Rickmers-Linie’s worldwide network.  

The newbuildings now ordered from Guangzhou Wenchong are identical to four vessels of the so called “Superflex Mumbai Max Class” to be built for Polaris by Wuhu Xinlian Shipbuilding, a contract that was announced last July. All eight have been purpose-designed for the carriage of breakbulk, heavylift and project cargo. With a deadweight of 24,000 tonnes, an overall length of 175m and a beam of 26.5m, they will be fitted with variable height tweendecks for maximum cargo flexibility. 

Each vessel will be equipped with three cranes, one capable of lifting 120 tonnes and two 350 tonne units that can be combined to handle loads of up to 700 tonnes.

The service speed of the ships will be up to 18 knots. The electronic control of the main engine utilizes the latest in technological development for the reduction of bunker consumption and CO2 emissions, thus contributing to a more environmentally friendly propulsion system. The vessels will furthermore be classed in accordance with the "Environmental Passport" standard.

Maritime Reporter March 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Vessels

Washington State Ferry Tacoma Returns to Service

Washington State Ferry M/V Tacoma will return to work on the Seattle/Bainbridge Island route starting March 28 after suffering electrical damage last summer.   The

Greek Ferry Still Stuck

The Greek ferry that ran aground just outside of port on the Aegean Island of Kassos Wednesday night is still stuck. The 227 passengers and 55 crew aboard the

Two ASD Tugs Delivered to URAG

URAG has taken delivery of two ASD 2411 Tugs to add to its existing fleet. Named Brake and Perfect, the new vessels have joined their sister ship Prompt in the

 
 
Maritime Careers / Shipboard Positions Maritime Security Maritime Standards Navigation Offshore Oil Pipelines Port Authority Salvage Ship Electronics Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1644 sec (6 req/sec)