StatoilHydro and Aker Solutions Sign Agreement

Wednesday, October 08, 2008

Aker Solutions has signed a letter of intent with StatoilHydro to enter into a frame agreement for the delivery of drilling equipment and related operational services.  

The agreement will put Aker Solutions among the preferred suppliers of drilling equipment and operational services to StatoilHydro operated fields.

The agreement for the delivery of Aker Solutions drilling equipment is awarded for a three year period with an optional period of two (2) x two (2) years. The agreement for operational services will run for five years with an optional period of two (2) x five (5) years.

The contract between StatoilHydro and Aker Solutions is expected to be signed and made effective mid October 2008.

The contract party is Aker Solutions subsidiary Aker MH AS.

 

Maritime Reporter November 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

Port of Galveston to Repair Public Pier

Galveston Wharves’ board of trustees today unanimously approved a project to repair pilings and pier deck in the Pier 19 area of the port. The board awarded the contract,

NASSCO Cuts Steel on APT "ECO Tanker"

General Dynamics NASSCO started construction of another ship in its commercial shipbuilding backlog, starting construction of a second “ECO” tanker to be built

Multraship Buys Three More Tugboats from Damen

Multraship and Damen Shipyards Group agreed on three new ASD (Azimuth Stern Drive) Tugs, all for delivery to Multraship in 2015. After delivery in Vietnam, scheduled

 
 
Maritime Contracts Maritime Standards Navigation Offshore Oil Pipelines Pod Propulsion Port Authority Salvage Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1002 sec (10 req/sec)