NASSCO Starts Construction of Tenth T-AKE Ship

Wednesday, October 08, 2008

General Dynamics NASSCO began construction of the tenth ship of the U.S. Navy's T-AKE program. The ship will be named later and is scheduled to be delivered to the Navy in the third quarter of 2010.

The T-AKE ship incorporates international marine technologies and commercial ship-design features, including an integrated electric-drive propulsion system to minimize operating costs over its projected 40-year service life. The primary mission of the ships is to deliver as much as 10,000 tons of food, ammunition, fuel and other provisions to combat ships at sea. NASSCO has delivered the first five ships of the T-AKE class and has construction contracts for five additional ships. The Navy is expected to order the construction of a total of 14 ships.


Shipbuilding

Austal Dives into Loss

Australia’s largest shipbuilder Austal posted a full year loss of $84.28 million because a program to build war ships for the US Navy took longer than expected.

Keppel to Deliver First North Sea FPSO

Keppel Offshore & Marine (Keppel O&M)'s wholly-owned subsidiary Keppel Shipyard Ltd (Keppel Shipyard) is on track to deliver a Floating Production Storage and Offloading

STX to Slash Jobs, Sell Yard

To stat above water by restructuring, South Korean Shipbuilder STX Offshore & Shipbuilding Co. plans to lay off about a third of its workforce and sell a yard in France, says a report in WSJ.

 
 
Maritime Security Maritime Standards Naval Architecture Navigation Salvage Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0649 sec (15 req/sec)