Lawsuit Brought Over Cutter Contract

Thursday, October 16, 2008

Lockport, La.-based Bollinger had a joint venture with Northrop Grumman Ship Systems Inc. to extend the length of 49 Coast Guard cutters from 110 feet to 123 feet. But the first eight boats produced under that contract were taken out of service when the frames cracked on their maiden voyages.

(Source: The Associated Press)

Maritime Reporter September 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Legal

Court Dismisses Boating Industry’s Challenge to EPA Misfueling Rule

The National Marine Manufacturers Association (NMMA) said it is disappointed with the U.S. Court of Appeals decision released on Tuesday, October 21, 2014 for the D.

Lavrov: No need for NATO in the Arctic

During the open lecture on Russia’s foreign policy, Foreign Minister Sergei Lavrov stated that he could see no need for NATO presence in the Arctic. ‘From time to time,

ITIC Measures against Ebola

The International Transport Intermediaries Club (ITIC) has issued the following general advice related to the outbreak of Ebola. Vessels that have recently

 
 
Maritime Contracts Maritime Security Navigation Pipelines Port Authority Salvage Ship Electronics Ship Repair Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1445 sec (7 req/sec)