Lawsuit Brought Over Cutter Contract

Thursday, October 16, 2008

Lockport, La.-based Bollinger had a joint venture with Northrop Grumman Ship Systems Inc. to extend the length of 49 Coast Guard cutters from 110 feet to 123 feet. But the first eight boats produced under that contract were taken out of service when the frames cracked on their maiden voyages.

(Source: The Associated Press)

Maritime Reporter February 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Legal

Holland America Line Heads NOAA's List of Weather Observations

Holland America Line topped the list in 2014 for the World’s Leading Weather Observing Cruise Ship Companies who submitted weather information to the National

Cook Islands to Issue Wreck Removal Certificates

The Cook Islands has acceded to the Nairobi International Convention on the Removal of Wrecks, 2007 (“The Nairobi Convention”). As a State Party, Cook Islands

Danelec Marine Unveils eSERVICEConnect Initiative

Danelec Marine launched its new eSERVICEConnect initiative today in a move to automate and streamline shipboard service for its products worldwide. Danelec’s eSERVICEConnect is an Internet,

 
 
Maritime Contracts Maritime Standards Naval Architecture Navigation Offshore Oil Salvage Ship Electronics Ship Simulators Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2534 sec (4 req/sec)