Lawsuit Brought Over Cutter Contract

Thursday, October 16, 2008

Lockport, La.-based Bollinger had a joint venture with Northrop Grumman Ship Systems Inc. to extend the length of 49 Coast Guard cutters from 110 feet to 123 feet. But the first eight boats produced under that contract were taken out of service when the frames cracked on their maiden voyages.

(Source: The Associated Press)

Maritime Reporter August 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Legal

Australia, New Zealand Navies Intercepts Drugs off Africa

A combined Australian and New Zealand operation 260 km off the coast of Africa has seized more than 5.6 metric tons of cannabis resin worth an estimated $280 million (AUD).

Nigerian Oil Workers Call Off Strike After Talks with Government

Nigerian oil workers' unions have called off a four-day strike after reaching a deal with the government in a dispute over pensions, they said on Saturday. A

Nigerian Minister Pledges $1.3 bln for Power Companies

Nigeria's oil minister announced a 213 billion naira (1.3 billion US dollar) bail-out package for power companies on Saturday, nearly a year after the sector was privatised.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Standards Naval Architecture Navigation Offshore Oil Port Authority Salvage Ship Repair Ship Simulators
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1025 sec (10 req/sec)