WA Petitions Against LNG Terminal License

Tuesday, October 21, 2008

In this case, Ecology argues the Federal Energy Regulatory Commission (FERC) prematurely awarded a license in September to Northern Star Natural Gas for a liquefied natural gas terminal and pipeline that impacts Washington and communities.

The proposed pipeline route for the Bradwood Landing project would cross the Columbia River and extend 17 miles underground through .

Federal law requires FERC to perform a detailed environmental impact review. Ecology takes issue with the adequacy of FERC's review which guided the Commission's license decision.

Rather than wait for FERC's decision on the request for rehearing, Gov. Chris Gregoire directed Ecology to help conduct a thorough environmental review through the State Environmental Policy Act.

Ecology also has responsibility to determine whether construction and operation of a pipeline running through can meet state water quality standards and this review needs to occur ahead of any FERC decision.

Ecology's request for rehearing asks FERC to reconsider its September decision on the following factors:

  • The analysis of potential risk to the public and emergency preparedness falls short.
  • The analysis of impacts of LNG tanker ballast water withdrawals on fish and discharge of engine cooling water on river temperature is lacking.
  • The analysis of the impact of larger ships and increased traffic on wake stranding of juvenile salmonids is insufficient.
  • The evaluation of greenhouse gas emissions is inadequate.
  • FERC's review fails to fully analyze the effects on commercial and recreational fishing due to shipping delays caused by LNG vessels.
  • The potential for landslides along proposed pipeline routes and pipeline integrity management hasn't been adequately evaluated.

is not alone in its challenge of FERC's timing. The state of is filing a similar reconsideration request.

Ecology should hear from FERC within the next 30 days. If FERC agrees to reconsider its decision, there is no time frame for it to issue a new decision.

Earlier this year, Ecology sought reconsideration of a FERC decision on a wave energy project along the coast. In that instance, FERC declined Ecology's request and the state is pursuing federal court review.

(www.ecy.wa.go)

Maritime Reporter September 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Legal

ITIC Measures against Ebola

The International Transport Intermediaries Club (ITIC) has issued the following general advice related to the outbreak of Ebola. Vessels that have recently

ClassNK's Guidelines for Exhaust Gas Cleaning Systems

Leading classification society ClassNK announced that it has released Guidelines for Exhaust Gas Cleaning Systems. These guidelines cover class safety requirements

China, Vietnam Pledge Maritime Cooperation

China and Vietnam have agreed to "address and control" maritime disputes, state media said on Friday, as differences over the potentially energy-rich South China

LNG

World’s 1st LNG Hybrid Barge Christened "Hummel"

The world’s first LNG hybrid barge of Becker Marine Systems was christened with the name "Hummel" on October 18, 2014, at Grasbrook Quay in HafenCity Hamburg.

U.S. Natgas Engine Sales Lagging Fuel's Steep Price Plunge

Natural gas-fueled engines, touted as a clean, low-cost alternative to diesel, continue to struggle for acceptance in the U.S. transportation sector despite

KBR, Daewoo win Eni FLNG FEED

KBR Inc. announced today that the KD Consortium, consisting of KBR and Daewoo Shipbuilding & Marine Engineering Company, Ltd, has been awarded a front end engineering

 
 
Maritime Contracts Maritime Security Pod Propulsion Port Authority Salvage Ship Electronics Ship Repair Ship Simulators Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1657 sec (6 req/sec)