New Navy Contracts

Thursday, November 06, 2008

L3 Communications Titan Corp., San Diego, Calif., is being awarded a $5,617,177 modification on a previously awarded firm-fixed-price contract (N00019-07-C-0071), to exercise an option for the Phase II study and analysis to develop innovative solutions to be used in mission requirements for the Affordable Weapons System. This weapon system is being designed to fill a sea-based land attack and strike mission, to operate from ships, with potential for a sea-based Navy and Marine Corps aircraft launch capability. Work will be performed in San Diego, Calif., and is expected to be completed in November 2009. Contract funds will not expire at the end of the current fiscal year. The Naval Air Systems Command, Patuxent River, Md., is the contracting activity.

Precon Marine, Inc., Chesapeake, Va., is being awarded a $6,796,845 firm-fixed-price contract for bulkhead repairs at Naval Station, Norfolk, Va. The work to be performed provides for bulkhead repairs, and includes provision of sheet pile in front of the existing bulkhead with concrete in–fill, provision of a jet-grouted soil curtain wall behind the existing bulkhead, provision of additional fill material with a geo-textile grout matt overlay for sheet pile toe stabilization; seawall repairs, tie rod repairs, repair of existing fender system, and related work behind the existing bulkhead. Work will be performed in Norfolk, Va., and is expected to be completed by November 2009. Contract funds will expire at the end of the current fiscal year. This contract was competitively procured via the Navy Electronic Commerce Online website, with nine bids received. The Naval Facilities Engineering Command Mid-Atlantic, Norfolk, Va., is the contracting activity (N40085-09-C-4202).

(Source: U.S. Department of Defense)

Maritime Reporter October 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

Sapurakencana Wins 3 Petronas Oil blocks

SapuraKencana Petroleum Berhad today announced that it has entered into Sale and Purchase Agreements to acquire the entire interest of PETRONAS in 3 blocks offshore

Time-out for Kwanza Drilling

Statoil has decided to cancel the Stena Carron rig contract after fulfilling the work commitments in the Statoil-operated blocks 38 and 39 in the Kwanza basin offshore Angola.

President Pryor Retires from ExxonMobil Chemicals

Stephen D. Pryor, president, ExxonMobil Chemical Company and vice president of Exxon Mobil Corporation, has elected to retire on January 1, 2015, after more than 44 years of service.

Navy

HMAS Success Deploys to Middle East

After months of preparation, HMAS Success departed Garden Island in Sydney today for a six-month deployment to the Middle East Region to provide logistic support

USS Oscar Austin Deploys to 6th fleet

Arleigh Burke-class guided-missile destroyer USS Oscar Austin (DDG 79) departed Naval Station Norfolk Nov. 21 for a deployment to the U.S. 6th Fleet area of responsibility (AOR).

Steven Palazzo Visits HII, Newport

Huntington Ingalls Industries today hosted Rep. Steven Palazzo, R-Miss., for a tour of the company's Newport News Shipbuilding division. Palazzo represents the fourth district of Mississippi,

 
 
Maritime Contracts Maritime Security Offshore Oil Pipelines Port Authority Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1447 sec (7 req/sec)