Florida - USCG Pollution-Response Exercise

Tuesday, November 18, 2008

Coast Guard members from Sector St. Petersburg, Fla., and the Coast Guard Cutter Joshua Appleby, homeported in St. Petersburg, along with personnel from Port Manatee, conducted a pollution-response exercise at the Port of Manatee in Palmetto on Nov. 13.

The exercise was aimed at testing and improving the Coast Guard's ability to assemble, deploy and operate a Vessel of Opportunity Skimming System (VOSS). A VOSS is used to isolate and collect the spilled substance during or after a spill. A VOSS is designed to be transported to a spill site and convert a vessel, 60-feet or longer, into a single-ship, substance recovery platform. The Coast Guard Cutter Joshua Appleby, a 175-foot buoy tender, was used in the training exercise.

The last time a VOSS was deployed in the Tampa Bay area was Aug. 10, 1993, when two inbound fuel barges and an outbound phosphate freighter collided, spilling approximately 300,000 gallons of fuel.

The Coast Guard has 19 of these systems pre-positioned nationwide for pollution response. Port Manatee houses the Tampa Bay area's VOSS equipment along with 5,000-feet of foam-filled boom.

Each VOSS consists of two of the following:

•    Outrigger assembly with lifting davit
•    Sweep boom to collect the spilled substance
•    DESMI 250 floating weir skimmer with diesel-driven hydraulic prime mover and control stand/air compressor to recover the substance
•    Submersible off-loading pump
•    Portable inflatable barge (26,000 gallons) to store the substance

(Source: U.S. Coast Guard)

Maritime Reporter June 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Environmental

Quality hat-trick for GAC Marine Logistics

Global ship spares logistics provider GAC Marine Logistics Inc. (GML) has secured ISO certifications in recognition of its Quality Management, Environmental

BMT Oceanica Wins Major Water Corporation Bid

Marine and coastal environment specialist, BMT Oceanica (BMT), a subsidiary of BMT Group Ltd, is delighted to announce that it has won the bid to provide Ocean

First Panels Installed at Australia’s Biggest Solar Plant

The Australian Renewable Energy Agency today celebrated a major milestone with the installation of the first solar panels at AGL’s large-scale solar plant in Nyngan, NSW.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Naval Architecture Navigation Pipelines Pod Propulsion Port Authority Salvage Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1801 sec (6 req/sec)