EBDG Designs Oil Barges for Harley

Monday, November 24, 2008

Elliott Bay Design Group LLC (EBDG) recently announced that it has been awarded multiple contracts to design oil barges ranging in size from 31,500 to 83,000-barrel capacity for Harley Marine Services (HMS) of Seattle, WA. 

The series of projects began in January 2007 with the contract to design a 38,500-barrel oil tank barge.  EBDG completed the design and it was released for bid in May.  In June, HMS signed a long-term operating contract with its customer for four 31,500-barrel barges, and subsequently awarded a second contract to EBDG to modify its 38,500-barrel design to the shorter length, which was released for bid in July.  Four vessels are to be built to this design.

In July 2007, HMS awarded the contract to EBDG for the design of a 66,000-barrel oil tank barge.  In early 2008 HMS asked EBDG to modify this design, increasing the capacity to 83,000 barrels.

The first of the designs built is the 279-foot, 38,500-barrel tank barge, Dugan Pearsall, which was launched on August 9th at Gunderson Marine's deep-water facility in Portland, OR.  It has been towed to Seattle where it is being outfitted at Harley Marine's facility on Harbor Island.

The first of the 31,500-barrel vessels, the David Fanning, is currently under construction at US Barge in Portland, OR and is scheduled to be delivered in December of this year.

The 68,000 and 83,000-barrel designs are currently out to bid with an anticipated delivery in 2010.

(www.ebdg.com)

Maritime Reporter September 2013 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

RIMPAC Exercise Puts LCS Through Paces

It was the middle of May, and the littoral combat ship Independence was operating out of San Diego, testing components of the mine warfare mission package. The mission is one that,

New Superyacht ROCKIT.IT Launched by Feadship

Feadship says it has launched the outstanding 60.35-metre motoryacht ROCK.IT. Created for an experienced owner who has chartered Feadships and appreciated the essence of the brand,

FTA Approves WSF Ferry Terminal Plans

In the latest Washington State Ferries Weekly Update, Capt. George A. Capacci, Interim Assistant Secretary WSDOT/Ferries Division briefs as follows: "FTA approves

Naval Architecture

ASNE to Host Launch & Recovery Symposium

The American Society of Naval Engineers (ASNE) announced that registration has opened for its Launch and Recovery Symposium 2014: Launch and Recovery of Manned

MN 100: Guido Perla & Associates, Inc.

701 5th Avenue Seattle, WA 98104 Tel: (206) 768-1515  Email: Inga.Scholz@gpai.com Website: www.gpai.com President & CEO: Guido Perla The Company: With offices in the US,

‘Naval Architecture for Non Naval Architects’ Course

From September 15-18, 2014, HMC will provide a course “Naval Architecture for Non-Naval Architects” in Singapore and Kuala Lumpur. HMC facilitated this course in cooperation with M.

Barges

MN 100: Horizon Shipbuilding, Inc.

13980 Shell Belt Road Bayou La Batre, AL 36509 E-mail: trshort@horizonshipbuilding.com Website: www.horizonshipbuilding.com President and General Manager: Travis R.

US Rail Jams Force Rush to Roads and Rivers

U.S. coal-burning power utilities are being forced to turn to barges and more expensive trucks to move coal, desperate to shore up stockpiles left dangerously low

ABS to Class Ultra Deepwater Offloading Unit

The Remora HiLoad DP BR unit design approved by ABS will have advanced capabilities for offloading operations in Brazil's Santos Basin. ABS, a provider of classification

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Maritime Standards Navigation Offshore Oil Pod Propulsion Port Authority Ship Electronics Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1222 sec (8 req/sec)