Final Designs, King Abdullah Sea Port

Sunday, January 18, 2009

Emaar, the Economic City (Emaar.E.C), the Tadawul-listed company developing King Abdullah Economic City (KAEC), has revealed the final blueprints of the KAEC Sea Port, designed in coordination with Halcrow, the international consultancy specializing in the provision of planning, design and management services for maritime projects.

One of the six key components of the 168 million sq m KAEC, the Sea Port will be the largest in the Red Sea with a capacity to handle 20 million TEU (twenty ft equivalent container units). Planned as logistics hub, the port is uniquely bonded with city’s industrial zone, facilitating the flow of primary material and products to the industries within the zone, furthermore assisting regional and global export.

The company concluded a comprehensive study on the world’s most competitive ports to highlight the key design factors. The study took into consideration the neighboring infrastructure networks to aid the smooth flow of goods as well as the administrative buildings within the port. 

Set to be operational by Q1 2011 the KAEC Sea Port will consist of a multipurpose cargo terminal and a 1.7 million TEU container terminal, after which the capacity of the port will be increased on several phases.

As per design the port will have a depth of 18 meters permitting mega vessels to anchor. At a strategic location on the Red Sea and stationed on one of the largest and busiest shipping line routes, the mega-city’s Sea Port will create a regional logistics hub that will further stimulate the Saudi economy through new job and investment opportunities. Furthermore the port’s integrated transportation system promises to deliver cargo to various destinations – within the region and internationally.

Further to completion of design Emaar EC has chosen its partners to implement the project. After intensive studies and negotiations, a Memorandum of Understanding (MoU) was signed with DP World, one of the fastest-growing and established port operators with a breadth of international port development and management expertise, to develop and operate the first phase of the KAEC Sea Port. Emaar EC has also confirmed that it is in discussions with several investors interested in the port.

KAEC has six key components: the Sea Port, Industrial Zone, Central Business District (including the Financial District), Resort District, Educational Zone and Residential Communities. Work is progressing on schedule on the first phase of the project which includes the Sea Port, Industrial Zone, Resort District and Residential Communities.

The kingdom’s maritime sector plays a key role in shaping the country’s growth. Total cargoes handled in all Saudi ports reached more than 140m tonnes last year, a 5% increase on 2006, with Jeddah accounting for 42.15m tonnes.

Maritime Reporter September 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds


Retailers Well Stocked as Holidays Approach

Import cargo volume at the nation’s major retail container ports is expected to increase 3.3 percent this month over the same time last year as retailers make final

Commodities See Biggest Price Jump in 3 Years

Commodities jumped on Friday, headed for their largest weekly gain in more than three years as base metals roared higher after Glencore pledged to slash zinc output

Chevron Cylinder Oil Gains NOL from Wärtsilä

Chevron Marine Lubricants’ 100BN cylinder oil, Taro Special HT 100 has received approval for its use in another engine range – products made by Winterthur Gas & Diesel Ltd.

Maritime Careers / Shipboard Positions Maritime Contracts Maritime Standards Navigation Pod Propulsion Ship Electronics Ship Simulators Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1360 sec (7 req/sec)