J. Ray McDermott Awarded Pemex Contract

Wednesday, February 04, 2009

Houston-based J. Ray McDermott, a subsidiary of McDermott International, Inc., announced the award of a contract by Pemex Exploración y Producción for transportation and installation of the Ixtal-B and Maloob-C drilling platforms.  These projects are located in the Bay of Campeche, Mexico, in 216 and 272 feet of water, respectively.  Contracts of this nature are typically valued at more than $40m.

“This is the first installation contract Pemex has awarded directly to J. Ray and follows on the heels of our contract for the Maloob-C platform construction in December 2007,” said John Nesser, J. Ray’s Executive Vice President and Chief Operating Officer.

The Ixtal-B drilling platform comprises a 1,984-ton, four-leg jacket with 2,205 tons of piles, and a 2,205-ton topside. The Maloob-C drilling platform comprises a 3,527-ton, eight-leg jacket, 2,535-ton topside, and 3,307 tons of piles and 2,646 tons of 30-inch conductors. The Ixtal-B jacket will be a lift and set installation, while the Maloob-C jacket will be launched conventionally.

J. Ray will mobilize its DB50 construction vessel from the U.S. Gulf of Mexico in the second quarter of 2009 to perform the installation of both facilities.  Platform components for Maloob-C will be transported to the installation site onboard material barges from J. Ray’s Altamira fabrication facility, and components for Ixtal-B will be transported via material barges from a third party location. 

Project management for both platform installations will be performed by J. Ray’s Deepwater and Americas project management group located in the U.S. and Altamira, Mexico.  The project is expected to be completed before the third quarter of 2009.

Maritime Reporter July 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Offshore

IRSHAD Acquires Damen Shoalbuster 2308

Abu Dhabi Petroleum Ports Operating Company (IRSHAD), a part of the ADNOC Group of Companies, has taken delivery of a Damen Shoalbuster 2308, named Al Marfa 1.

BSEE Updates Hurricane Reporting Requirements

BSEE is providing updated guidance for the current and future hurricane seasons through a Notice to Lessees (NTL) released July 27, 2015. NTL 2015-G02 clarifies

Offshore Wind Shift to Drive Vessel Services Cooperation

Evolving procurement processes for U.K. Round 3 offshore wind farms will require a greater number of work streams, personnel with new and differing skills, and

 
 
Maritime Standards Naval Architecture Navigation Pipelines Pod Propulsion Port Authority Salvage Ship Repair Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.3715 sec (3 req/sec)