J. Ray McDermott Awarded Pemex Contract

Wednesday, February 04, 2009

Houston-based J. Ray McDermott, a subsidiary of McDermott International, Inc., announced the award of a contract by Pemex Exploración y Producción for transportation and installation of the Ixtal-B and Maloob-C drilling platforms.  These projects are located in the Bay of Campeche, Mexico, in 216 and 272 feet of water, respectively.  Contracts of this nature are typically valued at more than $40m.

“This is the first installation contract Pemex has awarded directly to J. Ray and follows on the heels of our contract for the Maloob-C platform construction in December 2007,” said John Nesser, J. Ray’s Executive Vice President and Chief Operating Officer.

The Ixtal-B drilling platform comprises a 1,984-ton, four-leg jacket with 2,205 tons of piles, and a 2,205-ton topside. The Maloob-C drilling platform comprises a 3,527-ton, eight-leg jacket, 2,535-ton topside, and 3,307 tons of piles and 2,646 tons of 30-inch conductors. The Ixtal-B jacket will be a lift and set installation, while the Maloob-C jacket will be launched conventionally.

J. Ray will mobilize its DB50 construction vessel from the U.S. Gulf of Mexico in the second quarter of 2009 to perform the installation of both facilities.  Platform components for Maloob-C will be transported to the installation site onboard material barges from J. Ray’s Altamira fabrication facility, and components for Ixtal-B will be transported via material barges from a third party location. 

Project management for both platform installations will be performed by J. Ray’s Deepwater and Americas project management group located in the U.S. and Altamira, Mexico.  The project is expected to be completed before the third quarter of 2009.

Maritime Reporter January 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Offshore

Damen Delivers Custom-Made Offshore Winches to Fugro

Damen Maaskant Shipyards, part of Damen Shipyards Group, has delivered two dedicated offshore winches to Fugro. The Dutch shipyard was responsible for the design,

Shell: UK Should Reduce North Sea Oil Tax

The British government should review a supplementary tax charge on North Sea oil producers as it has made the operation of some fields unrealistic, Shell Chief

Shell Eyes Arctic Drilling this Summer

Oil major Shell wants to revive its Arctic oil drilling programme this year after a near two-year suspension, angering environmentalists who say the risk of an oil spill is too high.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Standards Offshore Oil Pipelines Salvage Ship Electronics Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2309 sec (4 req/sec)