St. Lawrence Seaway Celebrates 50 Years

Wednesday, April 01, 2009

The St. Lawrence Seaway celebrated its 50th anniversary on March 31, at the St. Lambert Lock.  Inaugurated in 1959 by Queen Elizabeth II and President Eisenhower and proclaimed as one of the ten most outstanding Canadian engineering achievements of the past 100 years, the Seaway stands as evidence of an enduring asset.  Since its inception, over 2.5 billion tonnes of cargo valued in excess of $375b has been transported via the Seaway.

“The Seaway has been successful for the last 50 years and, despite today’s challenging economic conditions, we are pressing ahead with a number of initiatives to position the system for success during the next 50 years”, emphasized Richard Corfe, President and CEO of The St. Lawrence Seaway Management Corporation (SLSMC). Mr. Corfe was joined at the ceremony by his American counterpart, Collister Johnson Jr., Administrator of the Saint Lawrence Seaway Development Corporation (SLSDC).

Corfe outlined how lock equipment is being updated by applying today’s technology and how these enhancements will improve services provided to Seaway users.  A hands free mooring system currently being tested in the Seaway’s Welland Canal holds the potential to automate much of a vessel’s transit, while accommodating a wider variety of vessels into existing lock chambers.

Incentive programs initiated by the SLSMC were credited with attracting over 1.8 million tonnes of new cargo to the Seaway last year, contributing $3.2m in incremental revenue.  “We are optimistic that efforts to streamline Seaway operations, coupled with toll incentives, will attract new users to the system while spurring our customers to invest in new vessels”, stated SLSMC CEO Corfe.

On the subject of environmental stewardship, SLSDC Administrator Johnson underlined how ballast water management practices made mandatory at the beginning of the 2008 season are having the intended effect.  “No unmanaged ballast water is entering into the Seaway.  We are witnessing tangible results from our efforts”, noted Johnson.  “Ballast water” refers to water that is pumped into tanks onboard an unloaded cargo vessel in order to stabilize its transit, and is later released upon the loading of cargo.

Maritime Reporter May 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

News

DMW Marine Takes the Lead in Military Cranes

DMW Marine Group, LLC. has completed a number of projects for the U.S. Navy and foreign Navies in recent years, claiming a place as a go-to supplier for Navy departments globally.

US Oil Platform on Fire in Gulf Of Mexico

An oil platform caught fire and was evacuated in the U.S. Gulf of Mexico offshore Louisiana in the early hours of Friday, though no injuries were reported, the U.

USCG Tall Ship Sailing to the Bahamas

The U.S. Coast Guard Cutter Eagle is scheduled to arrive at Berth 14 at Prince George Wharf in Nassau, Bahamas on Thursday, May 28 as part of its 2015 cadet summer training deployment.

 
 
Maritime Contracts Maritime Security Naval Architecture Pod Propulsion Port Authority Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1697 sec (6 req/sec)