Northrop Grumman Delivers USS Makin Island

Tuesday, April 21, 2009

Northrop Grumman Corporation's (NYSE:NOC) Shipbuilding sector delivered to the U.S. Navy on April 16, one of the nation's newest and most advanced ships, the amphibious-assault ship Makin Island (LHD 8) during a short ceremony held on the vessel's flight deck.

Makin Island (LHD 8) was delivered to the U.S. Navy after successfully completing acceptance sea trials. Acceptance trials are conducted to allow representatives of the U.S. Navy Board of Inspection and Survey to witness and evaluate operation of ship systems and ship performance.

Makin Island is the eighth USS Wasp (LHD 1)-class amphibious assault ship built by the company's shipbuilders in Pascagoula, Miss. It is 844 ft long, 106 ft wide and weighs 42,800 tons. Its 70,000 horsepower hybrid propulsion system will drive it to speeds in excess of 20 knots. Makin Island contains the first gas turbine/electric-powered propulsion system ever used on large deck amphibious assault ships. The gas turbine engines and electric drive, a change from previous steam-powered amphibious-assault ships, will provide significant life-cycle savings in manpower and maintenance costs over the previous ships.

As a multi-purpose amphibious assault ship, Makin Island is designed to transport and land a Marine Expeditionary Unit, a force of almost 2,000 Marines, ashore by helicopter, landing craft and amphibious assault vehicle. It will also have secondary missions of sea control and power projection by helicopter and fixed-wing vertical short take-off and landing aircraft; command and control; and mission support, including a hospital with six operating rooms. Makin Island is scheduled for commissioning at its San Diego homeport in October 2009.

(www.northropgrumman.com)

Maritime Reporter August 2013 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Navy

Greek Warship Evacuates Libya Personnel

Greece safely evacuated embassy staff and more than one hundred Chinese and European nationals from Libya early on Friday with a navy frigate sailing back to the Greek port of Piraeus,

Rolls Royce Marine Awarded LCS Engine Repair Contract

U.S. Department of Defense informs that Rolls Royce Marine North America, Walpole, Massachusetts, is being awarded a US$9,000,000 firm-fixed-price repair order

ABS President Wiernicki Signs New MARAD Agreement

The American Bureau of Shipping (ABS) informs that it has entered into a new Memorandum of Agreement (MOA) establishing the policies and procedures regarding the

Vessels

Kurdish Crude Oil Tankships: End-Game Still in Doubt

After a legal show-down in Texas this week, the outlook for a handful of tankers holding some $300 million worth of Kurdish oil is not looking good. Seemingly

Scottish Sea Farms Takes New Vessel Delivery

Scottish Salmon Farms has taken delivery of its latest vessel – powered by twin Doosan V158TIH main engines supplied by WaterMota.   Designed by consultant naval

Pre-Mooring Safety Inspections at Trieste, Italy

The SIOT/TAL Terminal at Trieste has advised that the TAL Pre-Mooring Safety Inspection program will be modified from 1 September. The checks at road will affect:

 
 
Maritime Security Maritime Standards Naval Architecture Offshore Oil Pod Propulsion Port Authority Ship Repair Ship Simulators Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.3100 sec (3 req/sec)