Quantum Wins Cutter Contract

Wednesday, May 27, 2009

Quantum Marine Engineering won a contract to engineer, design, supply and support the roll stabilization systems for the U.S. Coast Guard's new class of Fast Response Cutters designated as the WPC project. Bollinger Shipyards, Inc. is the prime contractor for this new class of cutters.  The contract calls for up to 34 of these new ships to be built and delivered to the USCG over a multi-year contract. Over the past three years Quantum has been awarded contracts from a diverse range of military customers and builders for supply of roll stabilization systems for coastal patrol vessels, offshore patrol vessels, frigates and a number of special projects.

 

Maritime Reporter September 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Vessels

Wärtsilä, Diesel United Renew Pact

Wärtsilä and Diesel United Ltd in Japan have signed a ten-year renewal of their co-operation agreement for the sale, manufacturing and servicing of Wärtsilä low-speed marine engines.

MARAD Tests Alternative Power for Ships

The Maritime Administration (MARAD) is testing state-of-the-art, environmentally efficient technology onboard the Training Ship (TS) Kennedy.   The National Defense

St. Lawrence Seaway Workers Extend Strike Deadline

The union that represents workers on the St. Lawrence Seaway, the waterway that links the Great Lakes and the Atlantic Ocean, has extended a strike deadline to Monday at 5 p.

 
 
Maritime Careers / Shipboard Positions Maritime Standards Naval Architecture Navigation Pipelines Pod Propulsion Port Authority Salvage Ship Repair Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1972 sec (5 req/sec)