Quantum Wins Cutter Contract

Wednesday, May 27, 2009

Quantum Marine Engineering won a contract to engineer, design, supply and support the roll stabilization systems for the U.S. Coast Guard's new class of Fast Response Cutters designated as the WPC project. Bollinger Shipyards, Inc. is the prime contractor for this new class of cutters.  The contract calls for up to 34 of these new ships to be built and delivered to the USCG over a multi-year contract. Over the past three years Quantum has been awarded contracts from a diverse range of military customers and builders for supply of roll stabilization systems for coastal patrol vessels, offshore patrol vessels, frigates and a number of special projects.

 

Maritime Reporter February 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Vessels

USCG Free Boat from Ice Near Woods Hole

A Coast Guard crew responded to a fishing vessel trapped in ice in Woods Hole Passage, Woods Hole, Massachusetts, Saturday. At about 3 p.m., the crew of the fishing boat Capt.

Tug Boat Owner Jailed After Crew Man Dies

A tug boat owner was today was given an 8 month custodial sentence after his crew member died trying to reattach a tow line in a violent storm. During today’s hearing at Southampton Crown Court,

Long Beach Harbor Tour Season

Long Beach Port is once again giving tourists opportunity to enjoy a rare view of port operations on a free Port of Long Beach harbor tour. The organizers are

 
 
Maritime Security Maritime Standards Naval Architecture Pod Propulsion Port Authority Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1660 sec (6 req/sec)