Quantum Wins Cutter Contract

Wednesday, May 27, 2009

Quantum Marine Engineering won a contract to engineer, design, supply and support the roll stabilization systems for the U.S. Coast Guard's new class of Fast Response Cutters designated as the WPC project. Bollinger Shipyards, Inc. is the prime contractor for this new class of cutters.  The contract calls for up to 34 of these new ships to be built and delivered to the USCG over a multi-year contract. Over the past three years Quantum has been awarded contracts from a diverse range of military customers and builders for supply of roll stabilization systems for coastal patrol vessels, offshore patrol vessels, frigates and a number of special projects.


Maritime Reporter September 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds


Search for El Faro Crew Continues, Hopes Fading

Responders continue the hunt for possible survivors from the missing cargo ship El Faro, which is believed to have sunk during Hurricane Joaquin.   As of Tuesday night,

India Extends Tax Benefits on Bunker Fuel

India has extended the benefit of nil custom and production tax on bunker fuels to domestic coastal movement of containers, in a move to decongest its roads and reduce carbon emissions,

Two RAscal 1500 Tugs Delivered

Sanmar Shipyard of Turkey has recently completed two RAscal 1500 tugs for Jordanian owners. The tugs are now delivering marine services to the FSRU berthing

Maritime Careers / Shipboard Positions Maritime Security Maritime Standards Navigation Offshore Oil Pipelines Salvage Ship Simulators Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1017 sec (10 req/sec)